Using a Phased Approach to Plan for Condition Assessment of a Lime Slurry Force Main Using In-Line Inspection Technology

机译:使用分阶段方法来规划利用在线检测技术的石灰浆作用的条件评估

获取原文

摘要

The City of Columbus Department of Public Utilities (DPU) operates three water treatment facilities, including the Hap Cremean Water Plant (HCWP) and the Dublin Road Water Plant (DRWP). The HCWP and DRWP treat surface water with a variety of processes including lime softening. The waste lime slurry from this process is pumped to a waste quarry through a 17-mile long 12-inch diameter ductile iron (DI) force main for the HCWP and a three-mile-long 14-inch diameter DI force main for the DRWP. There have been some failures on the pipelines in the past, some due to corrosion impacts, which have resulted in lime slurry releases to waters of the State. Due to these releases, the Ohio EPA directed the City to take the proper actions to prevent further releases of lime slurry from the main. The City contracted with Brown and Caldwell to conduct an inspection of the pipelines to determine condition and to identify deteriorated sections. Brown and Caldwell proposed the use of the See Snake electromagnetic in-line inspection tool from PICA, Inc., a division of Russell NDE. Like most utility owners, the City is wary of inserting tools into pipelines that may already be weakened by corrosion. Brown and Caldwell and PICA have developed a three-phase program to introduce the inspection technology to the City and to carefully manage the risks to the pipeline. The first phase in the program is the inspection of a similar sized water main. A 1,700 foot segment of 12-inch DIP water main was selected due to its ease of access and potential for minimal disruption to service. With the confidence developed from a successful inspection in Phase One, a second pilot phase would be initiated to perform an in-line inspection on a selected segment of the lime slurry line. The goal of Phase Two was to prove that the approach is feasible in the slurry system and to further build confidence in the technology and approach. Phase Three would entail the inspection of the remainder of the pipeline. The paper will describe the planning that went into the preparation for the inspections, the results of the inspections, and a discussion of the lessons learned.
机译:哥伦布市公用事业部(DPU)经营三种水处理设施,包括HAP Cremean水厂(HCWP)和都柏林路水厂(DRWP)。 HCWP和DRWP用各种过程处理地面水,包括石灰软化。从该过程的废物浆料通过17英里长的12英寸直径的球墨铸铁(DI)力主,用于HCWP和DRWP的三英里长的14英寸直径DI力主,从而将废物采石机泵送到废物采石场。 。过去有一些失败,有些因腐蚀的影响而导致的腐蚀影响,这导致石灰浆料释放到国家的水域。由于这些版本,俄亥俄州EPA指示城市采取适当的行动,以防止来自主要的雷姆浆料的进一步释放。该市与棕色和考德威尔签约,对管道进行检查,以确定病情并识别劣化的部分。布朗和考德威尔提出了从拉塞尔NDE的一个部门的Pica,Inc。使用See Snake电磁在线检查工具。与大多数公用事业所有者一样,该市谨慎旨在将工具插入管道上可能已经通过腐蚀削弱。布朗和卡尔德威尔和皮卡制定了三相计划,向城市推出检验技术,并仔细管理管道的风险。该程序中的第一阶段是对类似尺寸的水主要的检查。由于其易于访问和潜力,因此选择了1,700英寸的12英寸浸水主要段,以便最小的服务中断。利用从阶段成功检查的置信度,将启动第二导阶段,以对石灰浆线的选定段进行在线检查。第二阶段的目标是证明该方法在泥浆系统中是可行的,并进一步建立对技术和方法的信心。第三阶段将需要检查其余的管道。本文将描述进入检查的计划,检查的结果,以及对学习经验教训的讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号