Unraveling the Mystery of Lake Jackson Dam

机译:揭开杰克逊湖大坝的神秘面纱

获取原文

摘要

In July 2011, open chambers were identified within the dam interior, beneath a sloping concrete shell at the upstream face of dam. A month later, the dam survived a 5.8 magnitude earthquake. In May 2012, flow was noted at two 9-inch (23 cm) diameter toe drains; and after a large precipitation event, flow from these toe drains increased dramatically. Interim risk reduction measures were implemented and a detailed investigation was performed to characterize the location/extent of internal chambers and flow within the dam interior. A combination of observation-hole penetrations, underwater sonar, soundings, and dye tracer tests were performed. The investigation revealed two penetrations through the upstream concrete shell, and active flow within the dam interior. In-the-wet construction generally entailed temporary seals, underwater-placement of self-consolidating concrete to fill fourteen hollow chambers, and toe scour repair. Temporary seals were an asset to effectively repair earthquake damage and return Lake Jackson Dam to service.
机译:2011年7月,在大坝内部,大坝上游面的倾斜混凝土壳下方发现了开放的洞室。一个月后,水坝在5.8级地震中幸存下来。 2012年5月,在两个9英寸(23厘米)直径的脚趾排水口发现水流;在发生大的降雨事件之后,这些脚趾排水口的流量急剧增加。采取了减少风险的临时措施,并进行了详细的调查,以表征内室的位置/范围以及大坝内部的流动。进行了观察孔穿透,水下声纳,探测和染料示踪剂测试的组合。调查发现上游混凝土壳体有两次渗透,大坝内部有活跃水流。湿法施工通常需要临时密封,在水下放置自密实混凝土以填充14个中空室以及对脚趾进行冲刷修复。临时密封件是有效修复地震破坏并使杰克逊湖大坝恢复使用的资产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号