Downstream effects of impounding a natural lake: the Snake River downstream from Jackson Lake Dam, Wyoming, USA

机译:天然湖泊的下游效果:来自杰克逊湖坝下游的蛇河,美国

获取原文
获取原文并翻译 | 示例
           

摘要

A sediment mass balance constructed for a 16-km reach of the Snake River downstream from Jackson Lake Dam (JLD) indicates that river regulation has reduced the magnitude of sediment mass balance deficit that would naturally exist in the absence of the dam. The sediment budget was constructed from calibrated bed load transport relations, which were used to model sediment flux into and through the study reach. Calibration of the transport relations was based on bed load transport data collected over a wide range of flows on the Snake River and its two major tributaries within the study area in 2006 and 2007. Comparison of actual flows with unregulated flows for the period since 1957 shows that operations of JLD have reduced annual peak flows and increased late summer flows. Painted tracer stones placed at five locations during the 2005 spring flood demonstrate that despite the reduction in flood magnitudes, common floods are capable of mobilizing the bed material. The sediment mass balance demonstrates that more sediment exits the study reach than is being supplied by tributaries. However, the volume of sediment exported using estimated unregulated hydrology indicates that the magnitude of the deficit would be greater in the absence of JLD. Calculations suggest that the Snake River was not in equilibrium before construction of JLD, but was naturally in sediment deficit. The conclusion that impoundment lessened a natural sediment deficit condition rather than causing sediment surplus could not have been predicted in the absence of sediment transport data, and highlights the value of transport data and calculation of sediment mass balance in informing dam operations.
机译:为杰克逊湖坝(JLD)下游为16公里的蛇河达到了16公里的沉积物质量平衡表明,河流监管减少了沉积物质量平衡缺陷的严重缺陷,这些缺陷在没有大坝的情况下自然存在。沉积物预算由校准床荷载运输关系构建,用于将沉积物通量模拟进入和通过研究范围。运输关系的校准是基于在2006年和2007年在研究领域的广泛流量上收集的床上负荷运输数据,并于2006年和2007年在研究领域的两大支流中。自1957年以来,实际流动的实际流动的比较JLD的运营减少了年峰值流量,增加了夏季流动增加。在2005年春季洪水期间绘制的示踪石头位于五个地点,表明,尽管洪水幅度降低,但普通的洪水能够动员床材料。沉积物质量平衡表明,更多的沉积物退出研究到达,而不是由支流所提供的。然而,使用估计的未调节水文导出的沉积物的体积表明,在没有JLD的情况下,赤字的大小会更大。计算表明,蛇河在建造JLD之前没有均衡,但自然是沉积物赤字。结论,蓄水量减少了天然沉积物缺陷条件,而不是引起沉积物盈余在没有沉积物传输数据的情况下无法预测,并突出了运输数据的价值和沉积物质量平衡的计算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号