ASDSO 2015 A Race Against Mother Nature, Emergency Dam Safety Repairs at 11,000 feet

机译:ASDSO 2015与大自然赛跑,紧急大坝安全维修11,000英尺

获取原文

摘要

Ivanhoe Dam is located about 12 miles west of Leadville, Colorado in Pitkin County, just west of the Continental Divide at an elevation of about 11,000 feet. Emergency dam safety repairs were required at the dam due to significant deterioration of the outlet works structure resulting in noticeable piping of embankment material through the release pipe. The dam safety problem was first notice during a State inspection in July of 2014, and given the notably high elevation of the dam, the race against Mother Nature had started. The Owner, Busk-Ivanhoe Water System Authority (Authority), was forced to bid the job, select a contractor, mobilize to the remote site location and complete substantial construction of the project in a few months, before significant snow accumulation shuts down construction, which is typically the end of October. The dam was a homogenous embankment dam before construction, about 16 feet high, approximately 270 feet long, and impounds approximately 750 acre-feet. The dam also has an upstream seepage barrier system that consists of a layered system of geotextiles, geo-membrane, and geo-web. The dam is classified as a significant hazard structure by the State of Colorado, Office of the State Engineer, Dam Safety Branch (SEO). The reservoir is generally filled with uncontrolled spring runoff from the basin above the dam and from the three collection canals. As such, repairs of the dam needed to be complete prior to the winter shut down and the ensuing uncontrolled spring runoff. The major modifications to the dam included replacing the existing damaged outlet works 48-inch-diameter corrugated metal pipe (CMP) with a new 36-inch-diameter steel pipe; replacing the existing intake structure with a new concrete intake structure that includes a service spillway; constructing a downstream stability berm; adding a chimney filter, drain blanket and toe drain for seepage control; repairing the seepage barrier system, and replacing the emergency spillway control weir. This paper documents all of the designed features for the Ivanhoe Dam Rehabilitation Project, the challenges experienced during construction, the existing construction progress, and lessons learned during the project.
机译:艾芬豪大坝位于皮特金县科罗拉多州利德维尔以西约12英里处,位于大陆分界线以西,海拔约11,000英尺。由于出口工程结构的严重恶化,导致堤坝材料明显通过释放管,大坝需要进行紧急大坝安全维修。大坝安全问题是在2014年7月的一次国家视察期间首次发现的,考虑到大坝的高海拔,反对自然母亲的竞赛已经开始。业主Busk-Ivanhoe水系统管理局(Authority)被迫竞标,选择承包商,动员到偏远地点并在几个月内完成大量工程建设,之后大量积雪关闭了施工,通常在十月底。该大坝在建造前是一个均质的堤坝,高约16英尺,长约270英尺,蓄水约750英亩-英尺。该大坝还具有上游防渗系统,该系统由土工织物,土工膜和土工网的分层系统组成。大坝被科罗拉多州大坝安全处(SEO)国家工程师办公室归类为重大危害结构。从水坝上方的盆地和三个集水渠开始,水库通常充满不受控制的弹簧径流。因此,大坝的维修需要在冬季关闭和随之而来的不受控制的春季径流之前完成。大坝的主要修改包括用新的36英寸直径的钢管替换现有受损的48英寸直径的波纹金属管(CMP);用包括服务溢洪道的新的混凝土进水口结构替换现有的进水口结构;建造下游稳定护堤;添加烟囱过滤器,排水层和脚趾排水以控制渗漏;修理防渗屏障系统,并更换应急溢洪道控制堰。本文记录了艾芬豪大坝修复项目的所有设计功能,施工过程中遇到的挑战,现有施工进度以及在项目过程中获得的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号