【24h】

'Performance Improvement Program: Goals Experience'

机译:“绩效改进计划:目标和经验”

获取原文

摘要

1.Following long 54 month Refurbishment Outage Operational Performance had fallen below industry standards in a number of areas. 2.Leadership Development and succession planning had stalled. 3.Operational Focus was low primarily due to the construction focus during refurbishment. 4.Condition of balance of plant was poor including several long standing deficiencies.
机译:1.长达54个月的翻新中断运营绩效在许多领域均低于行业标准。 2.领导力发展和继任计划陷入僵局。 3.Operational Focus较低,主要是由于翻新期间的施工重点。 4.工厂的平衡条件差,包括一些长期存在的缺陷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号