首页> 外文会议>International topical meeting on probabilistic safety assessment and analysis >STAGGERING TESTING FOR THE REFUELING SURVEILLANCE REQUIREMENTS
【24h】

STAGGERING TESTING FOR THE REFUELING SURVEILLANCE REQUIREMENTS

机译:为满足监控要求而进行的测试

获取原文

摘要

The approach for changing Technical Specification surveillance frequencies requires the relocation of the periodic surveillance frequencies to a licensee controlled program; the Surveillance Frequency Control Program. After relocation, changes can be made to the Surveillance Frequencies following NEI 04-10, Rev. 1 guidance. This guidance requires an assessment of the impact of the proposed change on plant risk, as well as an assessment of the impact on defense-in-depth and safety margins. Other considerations include reviewing the operating experience of the impacted systems and components, component conditioning effects of the surveillance, component operating environment, requirements in industry codes and standards, and regulatory requirements. This paper focuses on extending the refueling surveillance frequencies to a staggered basis and applies the approach to the Integrated Engineered Safety Features/Loss of Offsite Power test at the Vogtle Electric Generating Station, Units 1 and 2.
机译:更改技术规范监视频率的方法要求将定期监视频率重新分配到被许可方控制的程序;监视频率控制程序。搬迁后,可以按照NEI 04-10,修订版1的指导对监视频率进行更改。该指南要求评估拟议变更对工厂风险的影响,以及评估对纵深防御和安全裕度的影响。其他考虑因素包括查看受影响的系统和组件的操作经验,监视的组件条件影响,组件的运行环境,行业规范和标准中的要求以及法规要求。本文的重点是将加油监控频率扩展到一个交错的基础上,并将该方法应用于Vogtle发电站1号和2号机组的综合工程安全功能/异地电力损失测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号