首页> 外文会议>International foundations congress and equipment expo >Design and Construction of a Sheet Pile Earth Retention System in Soft Clays
【24h】

Design and Construction of a Sheet Pile Earth Retention System in Soft Clays

机译:软粘土中薄板桩土保持系统的设计与施工

获取原文

摘要

Construction of a new multi-story high school in downtown Chicago, Illinois required a 5.5 m (18 ft) deep supported excavation. The 122 m (400 feet) × 30.5 m (100 feet) site was bordered on two sides by city streets and buried utilities, and on the other two sides by existing multi-story structures founded on shallow spread footings. The initial geotechnical exploration revealed the presence of urban fill underlain by very soft clay to depths well below the proposed excavation depth. An earth retention system (ERS) consisting of sheet piles and internal bracing was designed and constructed to protect the surrounding utilities and structures. Additionally, global stability was a concern due to the depth of the very soft clay and adjacent surcharge loads. This paper presents information about the design, construction, and observed performance of the excavation support system.
机译:伊利诺伊州芝加哥市中心新型多层高中建设需要5.5米(18英尺)的深度支持的挖掘。 122米(400英尺)×30.5米(100英尺)的网站由城市街道和埋葬的公用事业接壤,以及在浅蔓延基础上的现有多层建筑等双方。最初的岩土专门勘探揭示了城市填充下层的存在,非常软的粘土深入低于所提出的挖掘深度。设计并构建由片材桩和内部支架组成的地球保留系统(ERS)以保护周围的公用事业和结构。另外,由于非常软粘土的深度和相邻的附加载荷,全局稳定性是一个问题。本文介绍了有关设计,施工和观察到挖掘支持系统性能的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号