Lessons Learned from Ground Improvement on BART Fremont Central Park Subway Project in Fremont, California

机译:从加利福尼亚州弗里蒙特的Bart Fremont Central Park地铁项目的地面改进中学到的经验教训

获取原文

摘要

The San Francisco Bay Area Rapid Transit (BART) is a heavy rail transit system connecting San Francisco with other cities in the Bay Area, California. Currently BART is extending the existing Fremont line approximately 8.7 km south to a new Warm Springs Station. The project is divided into two major contracts, Fremont Central Park Subway (FCPS) and Line, Track, Station and Systems (LTSS). The FCPS contract primarily consisted of the construction of a 1.9 km long cut-and-cover subway box tunnel through challenging ground conditions and under a lake within a major recreational park. As part of the cut-and-cover subway box construction, ground improvements including installation of large diameter jet grout columns and cement deep soil mixing (CDSM) walls. Jet grout columns were installed using the conventional double-fluid system (grout and air) and a new method called the "Jetting Down" method. To support the subway excavation and to cut off the groundwater, contiguous walls consisting of overlapping CDSM columns were installed. To resist uplift from excess hydrostatic pressure and significant water inflow, a 3 to 7.3-meter thick soil cement grout plug was constructed under the subway box. This paper will discuss the challenges during construction of ground improvement for the FCPS project and lessons learned during installation of large diameter jet grout columns and CDSM cut off wall.
机译:旧金山湾区迅速运输(Bart)是一家重型铁路运输系统,将旧金山与加利福尼亚湾区的其他城市连接在一起。目前,BART正在向南方约8.7公里延伸现有的弗里蒙特线至新的温泉站。该项目分为两个主要合同,弗里蒙特中央公园地铁(FCP)和线路,轨道,站和系统(LTSS)。 FCPS合同主要由建造1.9公里长的剪切地铁箱隧道,通过挑战地面条件和一个主要的休闲公园内的湖泊。作为剪切地铁箱结构的一部分,地面改进,包括安装大直径喷射灌浆柱和水泥深土壤混合(CDSM)墙壁。使用传统的双流体系统(灌浆和空气)和一种称为“喷射向下”方法的新方法安装喷射灌浆柱。为了支持地铁挖掘和切断地下水,安装了由重叠CDSM色谱柱组成的连续墙壁。为了抵抗过量的静水压力和显着的水流入,在地铁箱下构建了3至7.3米厚的土壤水泥灌浆塞。本文将讨论建设FCPS项目建设过程中的挑战,并在安装大直径喷射灌浆柱和CDSM切割墙壁上的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号