Lessons Learned from Ground Improvement on BART Fremont Central Park Subway Project in Fremont, California

机译:在加利福尼亚州弗里蒙特的BART弗里蒙特中央公园地铁项目中,从地面改良中吸取的教训

获取原文

摘要

The San Francisco Bay Area Rapid Transit (BART) is a heavy rail transit system connecting San Francisco with other cities in the Bay Area, California. Currently BART is extending the existing Fremont line approximately 8.7 km south to a new Warm Springs Station. The project is divided into two major contracts, Fremont Central Park Subway (FCPS) and Line, Track, Station and Systems (LTSS). The FCPS contract primarily consisted of the construction of a 1.9 km long cut-and-cover subway box tunnel through challenging ground conditions and under a lake within a major recreational park. As part of the cut-and-cover subway box construction, ground improvements including installation of large diameter jet grout columns and cement deep soil mixing (CDSM) walls. Jet grout columns were installed using the conventional double-fluid system (grout and air) and a new method called the "Jetting Down" method. To support the subway excavation and to cut off the groundwater, contiguous walls consisting of overlapping CDSM columns were installed. To resist uplift from excess hydrostatic pressure and significant water inflow, a 3 to 7.3-meter thick soil cement grout plug was constructed under the subway box. This paper will discuss the challenges during construction of ground improvement for the FCPS project and lessons learned during installation of large diameter jet grout columns and CDSM cut off wall.
机译:旧金山湾区快速运输(BART)是连接旧金山和加利福尼亚湾区其他城市的重型铁路运输系统。目前,BART正在将现有的Fremont线向南延伸8.7公里,到新的Warm Springs站。该项目分为两个主要合同,弗里蒙特中央公园地铁(FCPS)和线路,轨道,车站和系统(LTSS)。 FCPS合同主要包括在具有挑战性的地面条件下以及在大型休闲公园内的湖下建造1.9公里长的明挖式地铁盒式隧道。作为明挖式地铁箱建设的一部分,对地面的改进包括安装大直径喷射灌浆柱和水泥深层土壤搅拌(CDSM)墙。使用常规的双流体系统(浆液和空气)和一种称为“ Jetting Down”方法的新方法来安装喷射灌浆柱。为了支持地铁的开挖并切断地下水,安装了由重叠的CDSM立柱组成的连续墙。为了抵抗过大的静水压力和大量的水流入而引起的隆起,在地铁箱下建造了一个3至7.3米厚的土壤水泥浆塞。本文将讨论FCPS项目地面改良施工过程中的挑战,以及在安装大直径射流灌浆柱和CDSM隔断墙过程中获得的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号