【24h】

Boiler and Process Heater Rule Impacts on Hill AFB

机译:锅炉和工艺加热器规则对希尔空军基地的影响

获取原文

摘要

The gap analysis, oversight inspections, and FEDS 6.0 lets Hill AFB seamlessly comply with the new Boiler and Process Heater Rule for major source installations. 75 CEG/CEIEA has concluded that Hill AFB is now in compliance with the one-time energy assessment requirement for existing boilers and process heaters set forth in Major Source Boiler MACT Rule. The report prepared by Hill AFB and detailing the methods and findings of the energy assessment, will serve as compliance documentation and is a valuable reference for ongoing energy management efforts at Hill AFB.
机译:差距分析,监督检查和FEDS 6.0使Hill AFB无缝地遵守针对主要气源安装的新《锅炉和过程加热器规则》。 75 CEG / CEIEA得出​​的结论是,Hill AFB现在符合“主要源锅炉MACT规则”中规定的对现有锅炉和过程加热器的一次性能源评估要求。 Hill AFB编写的报告详细介绍了能源评估的方法和结果,将作为合规性文件,并为Hill AFB正在进行的能源管理工作提供了宝贵的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号