首页> 外文会议>Underground construction technology international conference exhibition >Test Holes (Potholing) From A Contractor's Perspective
【24h】

Test Holes (Potholing) From A Contractor's Perspective

机译:承包商角度的测试孔(孔洞化)

获取原文

摘要

A firm specializing in Subsurface Utility Engineering or SUE which breaks down tasks into two phases: 1. Phase one: Utility Designation 2. Phase two: Utility Location SUE involves the use of several technologies including geophysics and vacuum excavation toward a goal of: 1. management of certain risks associated with utility mapping at appropriate quality levels, 2. utility coordination and relocation design, 3. utility condition assessment and communication of utility data to concerned parties.
机译:专门从事地下公用事业工程或SUE的公司将任务分为两个阶段:1.第一阶段:公用事业指定2.第二阶段:公用事业位置SUE涉及多种技术的使用,包括地球物理和真空挖掘,以实现以下目标:1。在适当的质量水平上管理与公用事业制图有关的某些风险; 2.公用事业的协调和搬迁设计; 3.公用事业条件的评估以及公用事业数据与有关各方的沟通。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号