首页> 外文会议>Underground construction technology international conference exhibition >Test Holes (Potholing) From A Contractor's Perspective
【24h】

Test Holes (Potholing) From A Contractor's Perspective

机译:从承包商的角度来看测试漏洞(Potholing)

获取原文

摘要

A firm specializing in Subsurface Utility Engineering or SUE which breaks down tasks into two phases: 1. Phase one: Utility Designation 2. Phase two: Utility Location SUE involves the use of several technologies including geophysics and vacuum excavation toward a goal of: 1. management of certain risks associated with utility mapping at appropriate quality levels, 2. utility coordination and relocation design, 3. utility condition assessment and communication of utility data to concerned parties.
机译:一家专门从事地下公用事业工程或起诉的公司,将任务分为两阶段:1。第一阶段:公用事业指定2.第二阶段:公用事业位置苏涉及使用几种技术,包括地球物理和真空挖掘,朝着目标:1的目标使用包括:1。管理在适当质量水平下与效用映射相关的某些风险,2.公用事业协调和搬迁设计,3.公用事能条件评估和有关缔约方的公用事业数据的沟通。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号