首页> 外文会议>Construction research congress >Near Miss Reporting Program to Enhance Construction Worker Safety Performance
【24h】

Near Miss Reporting Program to Enhance Construction Worker Safety Performance

机译:临近小姐举报计划,以提高建筑工人的安全绩效

获取原文

摘要

Construction safety performance in the past decade has stagnated where only marginal improvements have occurred. Past safety performance has been driven by lagging indicators including capturing safety data only after an illness, injury, or fatality occurred. A significant improvement can be realized through effective use of leading indicators, such as near miss data reporting, collection, and analysis. The primary objective is to identify best practices associated with a near miss reporting program for construction companies. A near miss reporting program was created from results of a review of literature and investigating established near miss reporting programs of many construction companies. The created near miss reporting program was implemented on construction projects of companies that previously failed to collect near miss data. Project safety managers and workers were surveyed periodically throughout the duration of the construction project to capture benefits, limitations, lessons learned, and suggestions from the implemented near miss reporting program. Results indicate near miss data can be reported, collected, and analyzed by construction personnel. Research deliverables including near miss reporting program guidelines, reporting flowchart, employee orientation presentation, and reporting materials can be used to implement a near miss reporting program or enhance an existing program for construction companies.
机译:在过去的十年中,建筑安全性能停滞不前,仅发生了很小的改善。过去的安全绩效是由落后的指标驱动的,这些指标包括仅在生病,受伤或死亡之后才捕获安全数据。通过有效利用领先指标(如未命中数据报告,收集和分析),可以实现重大改进。主要目标是确定与建筑公司险险报告计划相关的最佳实践。根据对文献的审查结果以及对许多建筑公司已建立的未遂报告程序的调查结果,创建了未遂报告程序。创建的接近未命中报告程序已在以前未能收集接近未命中数据的公司的建设项目中实施。在建设项目的整个过程中,会定期对项目安全经理和工人进行调查,以了解其收益,局限性,所汲取的教训以及已实施的未遂报告计划的建议。结果表明,施工人员可以报告,收集和分析几乎未命中的数据。研究可交付成果,包括差错报告计划指南,报告流程图,员工入职介绍和报告材料,可用于实施差错报告计划或增强建筑公司的现有计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号