首页> 外文会议>SAVE value summit;SAVE international annual conference >SAVE Value Summit 2014 June 23-25, 2014 Oak Brook Hills Resort - Chicago
【24h】

SAVE Value Summit 2014 June 23-25, 2014 Oak Brook Hills Resort - Chicago

机译:2014年SAVE价值峰会2014年6月23日至25日,橡树溪山庄渡假村-芝加哥

获取原文

摘要

The Missouri Department of Transportation (MoDOT) requested that its design consultant for the "Park Over the Highway" project, Crawford, Murphy & Tilly, Inc. (CMT), conduct a construction staging workshop at the 50-percent-plans design stage. The purpose of the workshop was to improve constructability, shorten the schedule, and reduce adverse impacts on local users and stakeholders during construction, as well as to help forge a large, diverse group of involved agencies into a unified project team. Since there were no formal MoDOT guidelines for this type of workshop, CMT's workshop facilitator employed the value methodology for the workshop structure, organization and process. This paper explains how the value methodology was adapted into a construction staging workshop and the ensuing results. The success of the Construction Staging Workshop on this project utilizing the value methodology demonstrates that the value methodology is a useful tool that can be effectively employed in ways beyond a traditional one-week value study.
机译:密苏里州交通运输部(MoDOT)要求其“公路上停车”项目的设计顾问,克劳福德,墨菲和蒂莉公司(CMT),在50%的计划设计阶段进行一次施工分期研讨会。讲习班的目的是在施工过程中改善可施工性,缩短工期并减少对本地用户和利益相关者的不利影响,并帮助将众多不同的参与机构组成一个统一的项目团队。由于没有针对此类研讨会的正式MoDOT指南,因此CMT的研讨会促进者采用了价值方法来确定研讨会的结构,组织和过程。本文解释了如何将价值方法论应用于建筑施工讲习班以及随后的结果。利用价值方法论对该项目进行的施工阶段研讨会的成功表明,价值方法论是一种有用的工具,可以用传统的为期一周的价值研究之外的其他方式有效地加以利用。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号