首页> 外文会议>International conference on computing in civil and building engineering >Information Exchange Requirements to Support Commissioning of HVAC and Building Envelope Components During an Energy Retrofit Project - A Comparative Case Study
【24h】

Information Exchange Requirements to Support Commissioning of HVAC and Building Envelope Components During an Energy Retrofit Project - A Comparative Case Study

机译:在能源改造项目中支持HVAC和建筑围护结构组件调试的信息交换要求-比较案例研究

获取原文

摘要

In order to support a variety of commissioning processes in an automated way, differences and commonalities regarding information exchanges and data flows associated with the commissioning of different types of systems and components should be identified and formalized. In relation to this, we investigated the construction phase of an energy retrofit project in Philadelphia, PA. Specifically, we studied two systems that directly affect the energy consumption, occupant comfort and the operation costs of a facility: the Heating Ventilation and Air Conditioning (HVAC) system and the building envelope. First we identified tasks, stakeholders and required information exchanges. Then, comparing these information exchanges with the Model View Definition of the Industry Foundation Class schema, we analyzed whether these exchanges exist or have to be created to support the use of computational tools during commissioning processes. This paper summarizes our findings.
机译:为了以自动化的方式支持各种调试过程,应识别和形式化有关与不同类型的系统和组件的调试相关的信息交换和数据流的差异和共性。与此相关,我们调查了宾夕法尼亚州费城的能源改造项目的建设阶段。具体来说,我们研究了直接影响设备的能耗,居住舒适度和运营成本的两种系统:供暖通风和空调(HVAC)系统和建筑物围护结构。首先,我们确定任务,利益相关者和所需的信息交流。然后,将这些信息交换与行业基础类模式的模型视图定义进行比较,我们分析了这些交换是否存在或必须创建以支持在调试过程中使用计算工具。本文总结了我们的发现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号