首页> 外文会议>World energy engineering congress >Session B4: Federal Project Implementation Lessons Learned VISN 11 ESPC - Lessons Learned Date
【24h】

Session B4: Federal Project Implementation Lessons Learned VISN 11 ESPC - Lessons Learned Date

机译:B4会议:联邦项目实施和经验教训VISN 11 ESPC-经验教训日期

获取原文

摘要

1. Large Complex project - lots of data 1.1 Contractor Side 1.1.1 During Pre IGA phase and during the IGA phase contractor had an ftp site. Ensure https protocol 1.1.2 After project award contractor switched to NEWFORMA 1.2 VA Side 1.2.1 Share Point maximum data storage limit proved too small 1.2.2 VA Files Share site had to be created. Well over 1 Terra byte of data to date. All data in Contractor site mirrored on VA site.
机译:1.大型复杂项目-大量数据1.1承包商方面1.1.1在IGA之前的阶段和IGA阶段,承包商拥有ftp站点。确保https协议1.1.2项目授予承包商切换到NEWFORMA之后1.2 VA端1.2.1共享点最大数据存储限制被证明太小1.2.2 VA文件共享站点必须创建。到目前为止,超过1 Terra字节的数据。 Contractor站点中的所有数据都已在VA站点上镜像。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号