【24h】

Claim Management of Construction Engineering

机译:施工工程索赔

获取原文

摘要

Claim is a special component of project costing. It is important to increase owner and contractor understands of it, to strengthen research on claim theory and method, to treat and manage engineering project claim seriously. When facing claim or realizing the potential possibility of claims in construction engineering project, the contractor will first need to send written notice to the Field Engineer appointed by the employer (the owner), according to the timeline set by the mutually signed construction contract. The contractor will then need to strengthen the engineering project construction plan and construction contract management.
机译:索赔是项目成本的特殊组成部分。增加所有者和承包商了解它,加强对索赔理论和方法的研究,认真对待和管理工程项目索赔。面临索赔或实现施工工程项目索赔的潜在可能性时,承包商首先需要向雇主(业主)指定的现场工程师(所有者)的潜在工程师,根据相互签署的施工合同所设定的时间表。然后,承包商需要加强工程项目建设计划和施工合同管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号