首页> 外文会议>AREMA annual conference >HIGH-SPEED RAIL (HSR) - NEW CORRIDOR DESIGN CHALLENGES AND ALTERNATE ANALYSIS (SHARED AND/OR GREENFIELD CORRIDORS)
【24h】

HIGH-SPEED RAIL (HSR) - NEW CORRIDOR DESIGN CHALLENGES AND ALTERNATE ANALYSIS (SHARED AND/OR GREENFIELD CORRIDORS)

机译:高速铁路(HSR)-新的走廊设计挑战和替代分析(共享和/或绿化走廊)

获取原文

摘要

This paper presents the various concepts and alternatives considered by Texas Central High-Speed Railway (TCR) and Arup to identify and evaluate potential High-Speed Rail (HSR) alignments between Houston and the Dallas/Fort Worth (D/FW) Metroplex which will accommodate speeds in excess of 200mph. The paper describes the project objectives, the initial planning process, and the identification of preliminary alternative alignments. It discusses the methodology and technology used by Arup in identifying and refining potential alignments within the Houston to D/FW corridor, in responding to the project objectives, and in giving due consideration to the dynamic characteristics of the rolling stock and systems technology. This paper introduces TCR's HSR project, its various technical challenges related to greenfield and shared high-speed passenger and freight rail corridors. The paper defines mitigation methodology for these challenges and describes the steps that could be taken in the planning and design process of the project and its objectives. It also takes into account the rail plan promulgated by the Texas Department of Transportation (TxDOT). The unique milestones planned for, and challenges addressed, during the course of the project are conversed in this paper and include: minimizing the right of way (ROW) take, lowering environmental impacts, designing a dedicated, grade separated alignment, and avoiding drainage basins. Various matrices were generated to identify grade separations, structural inventory, drainage inventory, ROW purchase/parcel information, and GIS databases that will be discussed in this paper.
机译:本文介绍了德克萨斯中央高铁(TCR)和奥雅纳(Arup)为确定和评估休斯顿与达拉斯/沃思堡(D / FW)Metroplex之间潜在的高铁(HSR)路线而考虑的各种概念和替代方案。可容纳超过200英里/小时的速度。本文描述了项目目标,初步计划过程以及初步替代方案的确定。它讨论了Arup在确定和改进休斯顿至D / FW走廊内的潜在路线,响应项目目标以及适当考虑机车车辆和系统技术的动态特性时所使用的方法和技术。本文介绍了TCR的高铁项目,与未开发地区以及共享的高速客运和货运铁路走廊相关的各种技术挑战。本文为这些挑战定义了缓解方法,并描述了在项目及其目标的规划和设计过程中可以采取的步骤。它还考虑到了得克萨斯州交通运输部(TxDOT)颁布的铁路计划。本文讨论了在项目过程中计划的独特里程碑和解决的挑战,其中包括:最小化道路使用权,降低环境影响,设计专用的,等级分隔的路线以及避免流域盆地。生成了各种矩阵来识别坡度分离,结构清单,排水清单,ROW购买/包裹信息以及GIS数据库,这将在本文中进行讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号