AVALANCHE AND DRAINAGE MITIGATION PROJECT, BNSF SNOWSHED NO. 7, ESSEX, MONTANA

机译:BNSF的雪崩和排水缓解项目7,埃塞克斯,蒙大拿州

获取原文

摘要

Avalanches have historically damaged railways traversing the watershed chutes in the John F. Stevens Canyon, between BNSF Railway mile posts 1165 and 1159, just east of Essex, Montana. To protect the railway, snowsheds have been constructed to divert the avalanches over the track structure. However, snowsheds were not designed to accommodate surface water flow. In 2013, BNSF and Jacobs Associates (the authors) designed and constructed a unique drainage basin and culvert system that captures surface water, conveying it over the snowsheds yet allows avalanches to pass over the snowshed unimpeded. The BNSF Railway near Essex, Montana, follows the historic Great Northern Railroad (GNR) route along the mountainous, scenic southern boundary of Glacier National Park. The railway traverses multiple avalanche chutes that drain large watersheds. In the early 1900's, GNR constructed Snowsheds Nos.1 to12 to protect the railway. Surface water was conveyed across the tracks via hand-dug ditches draining into culverts. Over the years, the ditches have filled with debris, resulting in the surface water being diverted over the snowsheds. Water leaking through the snowsheds has fouled the ballast beneath the tracks; the pumping action of passing trains jeopardizes the integrity of the track structure. Storm water and freeze/thaw cycles also scoured concrete from the snowshed structure, exposing rebar in the concrete walls and destabilizing foundation footings. Storm water plunging from the snowshed roofs has eroded embankments and access roads. Snowshed No. 7 has the most severe drainage problems with spring runoff washing out the bank and access road every year. The authors designed and provided construction oversight for this project including a reinforced earthen berm and graded catchment area to direct flow to a culvert intake and three reinforced, 3-foot diameter steel pipes to convey flow over the snowsheds into an existing creek. To counter the expected impacts of the avalanches, the design called for extra thick steel culverts to be installed over the snowshed, parallel to the flow of the avalanches, in addition to a low profile, rip-rap armored earthen berm which was anchored with soil nails and Tecco-Mesh.
机译:雪崩曾经破坏过穿越约翰·史蒂文斯峡谷(John F.Stevens Canyon)分水岭的铁路,该铁路位于BNSF铁路英里桩1165和1159之间,位于蒙大拿州埃塞克斯(Essex)以东。为了保护铁路,已经修建了雪崩区,以转移雪崩的轨道结构。但是,降雪场并非旨在容纳地表水流。 2013年,BNSF和Jacobs Associates(作者)设计并建造了一个独特的流域和涵洞系统,该系统可捕获地表水,将其输送到积雪堆上,但允许雪崩不受阻碍地越过积雪堆。蒙大拿州埃塞克斯附近的BNSF铁路沿着历史悠久的大北方铁路(GNR)路线,沿着风景秀丽的冰川国家公园南部边界。铁路横穿了多个雪崩溜槽,这些雪崩流失了大片流域。 1900年代初期,GNR修建了1至12号雪场来保护铁路。地表水通过排入涵洞的手挖沟渠输送到整个轨道。多年来,沟渠中充满了碎屑,导致地表水被转移到积雪堆上。积雪从漏雪处漏出,使道ast下的压载物结垢。过往列车的泵送动作会危害轨道结构的完整性。暴雨和冻融循环也使积雪覆盖的结构中的混凝土变质,使钢筋暴露在混凝土墙中,破坏了基础基础。从积雪的屋顶上掉下的雨水侵蚀了路堤和道路。七号雪场的排水问题最严重,每年的春季径流冲刷河岸和道路。作者为该项目设计并提供了施工监督,包括一个加固的土制护堤和分级的集水区,以将水流引至涵洞入口,以及三个加固的,直径3英尺的钢管,以将雪域上的水流输送到现有的小河中。为了应对雪崩的预期影响,该设计要求在雪堆上安装超厚的钢涵,与雪崩的流向平行,此外还有一个低矮的裂口装甲土质护堤,该土质锚固在土壤上指甲和Tecco-Mesh。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号