首页> 外文会议>ASME power conference >STANDARDIZATION OF CROSS FLOW TURBINE DESIGN FOR TYPICAL MICRO-HYDRO SITE CONDITIONS IN PAKISTAN
【24h】

STANDARDIZATION OF CROSS FLOW TURBINE DESIGN FOR TYPICAL MICRO-HYDRO SITE CONDITIONS IN PAKISTAN

机译:巴基斯坦典型微水力工况的贯流式水轮机设计标准化

获取原文

摘要

Pakistan has a hydro potential of approximately 42,000MW; however only 7,000MW is being utilized for electrical power production. Out of 42,000 MW, micro hydro potential is about 1,300MW. For typical site conditions (available flow rate and head) in Pakistan, Cross Flow Turbines (CFTs) are best suited for medium head 5-150m for micro-hydro power production. The design of CFT generally includes details of; the diameter of the CFT runner, number of blades, radius of curvature and diameter ratio. This paper discusses the design of various CFTs for typical Pakistan site conditions in order to standardize the design of CFTs based on efficiency that is best suited for a given site conditions. The turbine efficiency as a function of specific speed will provide a guide for cross flow turbine selection based on standardized turbine for manufacturing purposes. Standardization of CFT design will not only facilitate manufacturing of CFT based on the available site conditions with high turbine efficiency but also result in reduced manufacturing cost.
机译:巴基斯坦的水电潜力约为42,000兆瓦;但是,只有7,000MW被用于发电。在42,000兆瓦中,微型水电潜力约为1300兆瓦。对于巴基斯坦的典型现场条件(可用的流量和扬程),错流涡轮机(CFT)最适合用于微型水力发电的5-150m中扬程。 CFT的设计通常包括以下细节: CFT流道的直径,叶片数量,曲率半径和直径比。本文讨论了针对典型巴基斯坦现场条件的各种CFT的设计,以便基于最适合给定现场条件的效率来标准化CFT的设计。涡轮效率作为特定速度的函数,将为基于制造目的的标准涡轮选择横流式涡轮提供指导。 CFT设计的标准化不仅将有利于根据可用的现场条件以较高的涡轮效率进行CFT的制造,而且还将降低制造成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号