首页> 外文会议>ASME power conference >FOSSIL STEAM TURBINE UPGRADES/MODERNIZATIONS: CASE STUDIES OF RECENTLY COMPLETED PROJECTS AND THE INDUSTRY CHALLENGES MOVING FORWARD
【24h】

FOSSIL STEAM TURBINE UPGRADES/MODERNIZATIONS: CASE STUDIES OF RECENTLY COMPLETED PROJECTS AND THE INDUSTRY CHALLENGES MOVING FORWARD

机译:化石汽轮机升级/现代化:案例研究最近完成的项目和行业挑战向前发展

获取原文

摘要

Siemens Power Generation has recently completed a number of first time applications of Steam Turbine modernizations on its OEM fleet. This paper will discuss the R&D approach taken in developing these first-time solutions to help achieve and focus on case studies of completed projects that demonstrate the end result of this approach. Projects planned to be discussed are modernizations implemented in the last year (2007-2008) of a VHP/HP turbine steam path replacement, a full element HP/IP replacement, and applications on large fossil LP turbine replacements. Current industry challenges that will be discussed include resource constraints in engineering, material supply chain, and factory delivery slots that are escalating prices and increasing delivery times of replacement turbine equipment. Some of the actions the author's company is taking to mitigate these issues, such as gaining earlier commitments, use of material indices, and others will be discussed to help utilities looking at undertaking a turbine modernization gain a better insight into vendor challenges.
机译:西门子发电最近完成了汽轮机现代化在其OEM舰队上的许多第一次应用。本文将讨论开发这些首次解决方案的研发方法,以帮助实现和关注完成项目的案例研究,以证明这种方法的最终结果。计划讨论的项目是在VHP / HP涡轮机蒸汽路径更换的去年(2007-2008)实施的现代化,全元素HP / IP更换,以及大型化石LP涡轮机更换的应用。将讨论的当前行业挑战包括工程,材料供应链和工厂交付插槽中的资源限制,升级价格和更换替代涡轮设备的交货时间。提交人公司正在进行减轻这些问题的一些行动,例如获得早期的承诺,材料指数以及其他人将讨论,以帮助寻求进行的公用事业涡轮机现代化,从而更好地了解供应商挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号