首页> 外文会议>Winter Simulation Conference >Scheduling preventive maintenance tasks with synchronization constraints for human resources by a CP modeling approach
【24h】

Scheduling preventive maintenance tasks with synchronization constraints for human resources by a CP modeling approach

机译:通过CP建模方法对具有人力资源同步约束的预防性维护任务进行计划

获取原文
获取外文期刊封面目录资料

摘要

This paper presents an approach for scheduling different types of preventive maintenances (PMs) for a work center of a semiconductor manufacturing facility. The PM scheduling problem includes time-dependent synchronization constraints and is implemented in a constraint programming model. A mix of periodic and workload-specific maintenances is scheduled considering the synchronization to available engineers which have individual shift schedules and skills that define the range of feasible maintenances. This also comprises maintenances having process durations covering multiple shifts, which requires a continuous availability of sufficiently skilled engineers. Additionally to the PMs, also handling and maintaining of unscheduled downs is considered in the model. Multiple objectives are investigated and used for optimization and tested on realistic data. To compare the results an additional simulation model is built up.
机译:本文提出了一种为半导体制造工厂的工作中心安排不同类型的预防性维护(PM)的方法。 PM调度问题包括与时间有关的同步约束,并在约束编程模型中实现。考虑到与可用工程师的同步安排了定期维护和特定于工作负载的混合,这些工程师具有各自的轮班时间表和定义可行维护范围的技能。这还包括维护过程,其过程持续时间涵盖多个班次,这需要足够熟练的工程师的连续可用性。除了PM,模型中还考虑了意外停机的处理和维护。研究了多个目标,并将其用于优化并在实际数据上进行了测试。为了比较结果,建立了附加的仿真模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号