首页> 外文会议>Winter Simulation Conference >Yard crane dispatching to minimize vessel turnaround times in container terminals
【24h】

Yard crane dispatching to minimize vessel turnaround times in container terminals

机译:调度堆场起重机以最大程度减少集装箱码头中的船舶周转时间

获取原文

摘要

Yard crane (YC) dispatching in the operational planning of container terminals usually aims to minimize makespan of YC operations or waiting time of vehicles. We propose that minimizing the maximum tardiness of vehicle jobs at yard blocks will minimize the operational delay of the longest quay crane (QC). This will minimize vessel turnaround time which is one of the most important objectives of container terminals. A provably optimal algorithm, MMT-RBA* to minimize maximum job tardiness, is presented to sequence the YC jobs. Jobs requiring reshuffling of other containers, often ignored in other studies, are handled by embedded simulation in our optimization algorithms. Another provably optimal algorithm, MMS-RBA* to minimize makespan, is also presented. Simulation experiments confirm that MMT-RBA* significantly outperforms the optimal algorithm RBA* to minimize vehicle waiting time from earlier studies and MMS-RBA* to minimize makespan in minimizing vessel turnaround time.
机译:集装箱码头作业计划中的堆场起重机(YC)调度通常旨在最小化YC作业的工期或车辆的等待时间。我们建议最大程度地减少院子区车辆作业的最大拖延时间,将最大长度的码头起重机(QC)的操作延迟最小化。这将使船只周转时间最短,这是集装箱码头最重要的目标之一。提出了一种可证明的最佳算法,即MMT-RBA *,以最大程度地减少作业拖延时间,从而对YC作业进行排序。需要重新包装其他容器的作业在其他研究中经常被忽略,这些作业通过我们的优化算法中的嵌入式仿真来处理。还提出了另一种可证明是最佳的算法,即MMS-RBA *,可最大程度地减少制造期。仿真实验证实,MMT-RBA *的性能明显优于最佳算法RBA *,从而使早期研究的车辆等待时间最短;而MMS-RBA *的性能则使船只的周转时间最短,从而使制造时间缩短。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号