Improvements Made to the Bruce A Upgraders and Heavy Water Cleanup System as Part of the Bruce A Units 1 and 2 Restart Project and Commissioning Results

机译:作为Bruce A单元1和2的一部分,对Bruce A升级器和重水净化系统进行的改进重新启动项目和调试结果

获取原文

摘要

As part of the Bruce A Units 1 and 2 Restart Project, major modifications and maintenance were completed on the heat transport and moderator upgraders and the heavy water cleanup system. This represents the first time that major rehabilitation has been done to such systems in a CANDU nuclear station for the purpose of life extension. Prior to shutdown in 1997, the upgraders and cleanup system significantly underperformed against the stated design. The rehabilitation, which included major design changes and implementation of new systems, resulted in the upgraders exceeding design throughput and making product with quality much better than specified. This paper describes the work done, results from inspections and follow-up, and performance data from commissioning.
机译:作为布鲁斯A单元1和2重启项目的一部分,对热传输和减速器升级器以及重水净化系统的主要修改和维护已完成。这是为了延长寿命,首次在CANDU核电站对此类系统进行了重大修复。在1997年停产之前,升级程序和清理系统的性能大大低于上述设计。包括重大设计更改和新系统实施在内的修复工作导致升级程序超出了设计吞吐量,并使产品的质量大大超出了规定。本文介绍了已完成的工作,检查和跟进的结果以及调试的性能数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号