首页> 外文会议>World environmental and water resources congress >The Tingo Pucara water pumping system: a cultural case study in the Ecuadorean Andes
【24h】

The Tingo Pucara water pumping system: a cultural case study in the Ecuadorean Andes

机译:Tingo Pucara抽水系统:厄瓜多尔安第斯山脉的文化案例研究

获取原文

摘要

The potable water system in Tingo Pucara serves an indigenous community of approximately 100 people living in the Ecuadorean Andes, and is unique in both the daunting scale of its design and its extensive collaboration with in-country partners. As a result, the tri-chapter efforts of the Pittsburgh Professional, Carnegie Mellon University, and University of Pittsburgh Engineers Without Borders chapters that helped design the system were recognized with a 2012 EWB-USA Premier Project Award. At first, however, the sheer scope of building a single-stage pumping system powered by grid energy over 900 m of steep (< 37° slope), sandy mountain almost caused the project to be abandoned. Instead, the strong in-country support, including the non-governmental organization HCJB, a local Peace Corps volunteer, funding from the local municipality and electrical utility, and prodigious effort from the community of Tingo Pucara, supported the project to completion. Construction was not the only part of implementation; the chapter also had to navigate cultural expectations, develop an appropriate price point for household customers, and foster a water board that could care for the system throughout its lifetime. With the installation of the water system, the EWB team aims to improve the community's quality of life by reducing time spent gathering water and decreasing incidents of waterborne illness. Finally, the community water board will provide project sustainability as the water system moves forward.
机译:Tingo Pucara的饮用水系统为居住在厄瓜多尔安第斯山脉的大约100个人的土著社区提供服务,并且在其艰巨的设计规模以及与国内合作伙伴的广泛合作中均独树一帜。结果,匹兹堡专业人士,卡内基梅隆大学和匹兹堡大学无国界工程师分会三章的工作,帮助设计了该系统,并获得了2012年EWB-USA杰出项目奖。但是,起初,建造由电网能量驱动的超过900 m的陡峭山坡(<37°坡度)的单级抽水系统的绝对范围几乎导致了该项目的放弃。相反,在非政府组织的大力支持下,包括非政府组织HCJB,当地和平队的志愿者,当地市政当局和电力公司的资金以及Tingo Pucara社区的巨大努力,为该项目的完成提供了支持。建设不是实施的唯一部分;本章还必须考虑文化期望,为家庭用户制定适当的价格点,以及培育可以在系统的整个生命周期内对其进行维护的滤水板。通过安装供水系统,EWB团队旨在通过减少花水时间和减少水传播疾病的发生来改善社区的生活质量。最后,随着水系统的发展,社区水务委员会将提供项目的可持续性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号