首页> 外文会议>Offshore Technology Conference >(OTC 24042) Field Development Overview of Liuhua 11-1 and Liuhua 4-1 Oil Field
【24h】

(OTC 24042) Field Development Overview of Liuhua 11-1 and Liuhua 4-1 Oil Field

机译:(OTC 24042)柳华11-1和刘华4-1油田的现场开发概述

获取原文

摘要

The Liuhua 11-1 oil field, to date, the largest oil field in the South China Sea, is located in approximately 310 meter of water. It was the first deepwater field in the South China Sea originally developed by a consortium of Amoco, CNOOC and Kerr- McGee in 1995. The development includes a Floating Production System (FPS) with a subsea production system, and a Floating Production Storage Offloading (FPSO) located approximately 3km northwest of the FPS. The development of a nearby field, the Liuhua 4-1, about 11km away from Liuhua 11-1, was approved in early 2010 and produced in 2012 through the Liuhua 11-1 FPS facilities via subsea tieback, which requires to FPS life extension and topsides capacities upgrading for another 15 years. There are significant technical challenges for the life extension and dry dock upgrade of the FPS, as well as the subsea tie-back of the Liuhua 4-1 field. The FPS mooring and subsea control risers need to be disconnected and reconnected after the FPS drydock. The new 11km subsea pipeline between two oil fileds, control umbilical and electrical cable risers need to be installed. The FPS upgrade project started in 2010 and completed successfully in 2012 with the reconnection of the mooring and risers to the FPS. Both the Liuhua 11-1 and the Liuhua 4-1 fields are currently producing. This paper gives an overview of the Liuhua11-1 and Li uhua4-1 development as a case study for South China Sea deepwater development and also discusses the technology and project execution for developing nearby marginal fields.
机译:柳华11-1油田,迄今为止,南海最大的油田,位于大约310米的水中。它是1995年最初由Amoco,CNOOC和KERR-MCGEE联盟开发的南海的第一个深水领域。该开发包括浮动生产系统(FPS),具有海底生产系统,以及浮动生产储存卸载( FPSO)位于FPS的西北大约3公里。附近的领域的发展,刘华4-1,距柳华11-1的11km,于2010年初批准,2012年通过刘华11-1通过海底重建生产,这需要对FPS生命延期和将容量放在另外15年升级的能力。 FPS的生命延伸和干码头升级以及刘华4-1领域的海底搭配存在重大技术挑战。 FPS系泊和海底控制提升管需要断开并在FPS Drydock后重新连接。需要安装两个油档,控制脐带和电缆立管之间的新的11km海底管道。 FPS升级项目于2010年开始,并于2012年完成,重新连接停泊和立管到FPS。刘华11-1和刘华4-1场目前正在生产。本文概述了刘华11-1和李维雅4-1发展,以南海深水开发为一个案例研究,并探讨了发展附近边缘领域的技术和项目执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号