'SS-Offshore Offloading Systems and Operations' Bonded flexible Oil Offloading Lines, a cost effective alternative to traditional Oil Offloading Lines

机译:'SS-Offshore卸载系统和运营'粘合柔性油卸载线,是传统油卸载线的成本效果替代品

获取原文

摘要

In deepwater offshore fields where spread moored FPSOs are involved, the produced oil is generally offloaded to shuttle tankers via Oil Offloading Lines (OOLs) connected between the FPSO and deepwater buoy. Until recently, two types of Oil Offloading Lines (OOL) were used for the transfer of stabilized crude oil between the FPSO and the offloading buoy: steel pipe or unbonded flexible pipe. Since 2000 Trelleborg and SBM have been working on an alternative offloading solution made of bonded flexible hoses called TRELLINE? (see reference [1]). This product can be adapted to a large range of applications like for the offloading of oil from a MOPUstor to a submerged loading system (SLS). In September 2005, the TRELLINE? was used for OOL for the first time for SNEPCO who decided to supplement the existing Bonga OOL system with one 20" ID TRELLINE? to match with ultra short delivery. In December 2006, the OOL was installed with the SBM vessel Dynamic Installer (see reference [2]). In July 2008, Total Exploration Production Angola (TEPA) decided to use the TRELLINE? for the 18" ID OOLs of the Pazflor field. For Pazflor, the produced oil is exported from the FPSO to the buoy located 1,856m away, via two identical 18" OOLs of 2,070 m long, made of 175 hoses sections each. The OOLs are connected to the FPSO and the buoy by the means of gimbal tables that decouple the tension and bending loading. Specificity of Pazflor Trelline hoses was their hig desing pressure equal to 50 bars that had required intensive qualification and testing program, and making Pazflor export lines a "world-first". Based on past installation experiences on Bonga project (OOL) for SNEPCO in 2006 and on Yme project (SLS) for Talisman Energy Norge in 2008, see reference [3]), a new installation method has been developed. A specifically designed patented equipment was developed to ensure a safe and quick offshore installation. It comprises: 1. An A-Frame designed to upend individual hose from deck to the fire line. 2. An assembly platform designed for vertical assembly of the hoses. 3. A large deployment wheel ensuring the transition from vertical to horizontal of the OOL at the sea surface. In June 2011, the SBM vessel Normand Installer successfully installed the two Pazflor OOLs. The two OOLs were assembled and hooked up in less than 4 weeks (mobilizations included). The TRELLINE? OOL system demonstrated its advantages in term of design, procurement cost, lead time, installation efficiency and operational advantages. It will further demonstrate maintenance advantages.
机译:在涉及扩散停泊的FPSO的深水海上田地中,生产的油通常通过连接在FPSO和深水浮标之间的油卸载线(OOL)卸载到梭式油轮。直到最近,两种类型的油卸载线(OOL)用于FPSO和卸载浮标之间的稳定原油转移:钢管或未粘结的柔性管。自2000年Trelleborg和SBM一直在替代卸载溶液,由粘合的柔性软管组成,称为TRELLINE? (参见参考[1])。该产品可以适用于大量应用,例如用于将油从淘气机卸载到浸没式装载系统(SLS)。 2005年9月,格子?用于SNEPCO的首次用于OOL,他们决定用一个20“ID TRELLINE来补充现有的Bonga OOL系统?与超短交付相匹配。在2006年12月,使用SBM船只动态安装程序安装OOL(参见参考[2])。2008年7月,全面勘探生产安哥拉(TEPA)决定使用格子呢?为18岁的宪召领域的ID OOL。对于Pazflor,生产的油从FPSO输出到距离的FPSO到1,856米的浮标,通过两个相同的18“ool,2,070米长,每次由175个软管部分制成。ool通过手段连接到FPSO和浮标解耦张力和弯曲加载的万向节目。Pazflor Trelline软管的特异性是它们的Hig Desing压力等于50巴,已经需要密集的资格和测试计划,并使Pazflor出口线为“世界第一”。基于过去的安装2006年SNEPCO对Bonga项目(OOL)的经验和2008年的护身符enertioneGorge的yme项目(SLS),参见参考[3]),开发了一种新的安装方法。开发了一个专门设计的专利设备以确保A安全且快速的离岸安装。它包括:1。一个框架,旨在将单个软管从甲板上市到火线。2.设计用于软管垂直组装的装配平台。3.一个大型部署轮确保了一个大型部署轮e从垂直转换到海面上的ool水平。 2011年6月,SBM船舶Normand安装程序已成功安装了两个Pazflor OOL。在不到4周(包括的动员中,两个OOL组装并钩住)。格子? OOL系统在设计,采购成本,提前期,安装效率和操作优势期间展示了其优势。它将进一步证明维护优势。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号