首页> 美国政府科技报告 >Roll-On/Roll-Off (RO/RO) Merchant Vessel Offloading Facility Tests with the Calm Water Ramp (CWR) (COTS (Container Offloading and Transfer System) CNO Project 299, DT-IM-2)
【24h】

Roll-On/Roll-Off (RO/RO) Merchant Vessel Offloading Facility Tests with the Calm Water Ramp (CWR) (COTS (Container Offloading and Transfer System) CNO Project 299, DT-IM-2)

机译:使用平静水舷梯(CWR)进行滚装/下水(RO / RO)商船卸载设施测试(COTs(集装箱卸载和转运系统)CNO project 299,DT-Im-2)

获取原文

摘要

The United States has long included merchant ships in plans to support Navy Marine Corps Amphibious Assault Follow-on Echelon (AFOE) and Army Logistics Over-the-Shore (LOTS) operations. The shifts toward port-dependent cargo ships has given rise to the investigation of other methods/facilities to offload cargo without getting into development of complex harbor facilities similar to those used commercially. The tests with the calm water ramp (CWR) demonstrate, in part, the viability of using the ramp to offload nonself-sustaining roll-on/roll-off (RO/RO) ships in an offshore setting. Due to the unavailability of a nonself-sustaining RO/RO ship, all tests were designed to correspond and reproduce actual operating parameters. The ramp was raised through the extremes of its operating range and several representative military vehicles were driven up an included section of the CWR. The Causeway Platform Facility (CPF) was configured for ramp operations and moored alongside the merchant ship SS AMERICAN TROJAN where simulated vehicle offloadings from Causeway Ferries and Landing Crafts Utility (LCUs) were conducted. Based on these tests, the CWR and the CPF have demonstrated that can operate effectively to satisfy all of their design requirements.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号