首页> 外文会议>Offshore Technology Conference >Meeting the Demand for Barrier Plug Integrity Assurance Verification of Well Abandonment Barriers
【24h】

Meeting the Demand for Barrier Plug Integrity Assurance Verification of Well Abandonment Barriers

机译:满足对障碍插头的需求完整性保证和核查良好的遗弃障碍

获取原文

摘要

Well barrier installation practice is dictated by territoryspecific regulations which are largely based on historic practices. However, emerging technologies, tighteningnationalregulations, and demands from assetowners are gradually affecting the way we carry out our intervention operations. Driving the technology development is time saving but with a sharp eye on safety. Well documented verifications on temporary barriers and barriers installed for well suspension and future P&A barrier installation is expected. There are multiple issues involved in gaining proper verification of aninstalled barrier. One major issue appearing is the general condition and status of previously installed plugs and valve components in older wells, which canresult intwo wellbore barriers installed in close proximity. Othermajor issues are the well'sgeneral ability to support an inflow test, and the time it takes to get asegregating well stable.
机译:良好的屏障安装实践由领土特异性规定决定,主要基于历史性实践。但是,新兴的技术,突破性创新和来自安排者的要求逐渐影响我们执行我们的干预行动的方式。驾驶技术开发是节省时间,但尖锐的安全性。预计有关安装井悬架和未来P&A屏障安装的临时障碍和障碍的验证验证。获得了对Ainstalled屏障进行适当验证的多个问题。出现的一个主要问题是先前安装的旧井中的插头和阀门组件的一般情况和状态,其中Canresult Intwo井筒屏障靠近安装。其他问题是支持流入测试的井的能力,以及获得稳定稳定所需的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号