首页> 外文会议>Offshore Technology Conference >Managed Pressure Cementing in HPHT Utilizing Real Time Pressure Estimation and Control Software - A Case Study
【24h】

Managed Pressure Cementing in HPHT Utilizing Real Time Pressure Estimation and Control Software - A Case Study

机译:利用实时压力估计和控制软件管理HPHT的托管压力 - 一种案例研究

获取原文

摘要

MPD enables drillers to navigate through narrow drilling windows to reach designed target depths. After a hole section is drilled, pressure management is still required to pull drill strings out and run and cement liners. Conventional cementing programs and procedures may not be practical for a challenging hole section that has been drilled by MPD. Elaborate wellbore pressure management is required to ensure safe and efficient cementing operations. The same closed loop circulation system utilized for drilling is used to manage the wellbore pressure during cement operations. The technique of pressure management during liner cement jobs was utilized repeatedly by a major client in one of the most challenging HPHT campaigns in the North Sea. This paper provides an insight into the technique as well as information on the procedures, challenges and lessons learned pertinent to these operations. Various cases studies describing the setup, planning and execution of operations, simulation vs measured data will be compared.
机译:MPD使钻机能够通过狭窄的钻孔窗口导航,以达到设计的目标深度。钻孔孔部分后,仍然需要压力管理来拉出钻弦并运行和水泥衬垫。传统的硬质胶合计划和程序对于已经通过MPD钻井的具有挑战性的孔部分可能是不可行的。需要精心制定井筒压力管理,以确保安全有效的胶结操作。用于钻孔的相同闭环循环系统用于在水泥操作期间管理井眼压力。在北海最具挑战性HPHT活动中的一个主要客户中,衬垫水泥作业期间的压力管理技术是多次使用的。本文介绍了该技术的洞察力以及关于与这些操作相关的程序,挑战和经验教训的信息。各种案例研究描述了操作,规划和执行操作,将进行仿真VS测量数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号