INSIGHTS FROM DEVELOPMENT OF THE COMBINED PWR SAMG

机译:来自SAMG合并PWR SAMG的开发的见解

获取原文

摘要

The Pressurized Water Reactor Owner's Group (PWROG) is upgrading the original generic Severe Accident Management Guidelines (SAMGs). This upgrade includes a Phase Ⅰ, completed in January 2013, and a Phase Ⅱ, to be completed in December 2013. In Phase Ⅰ, the three original Pressurized Water Reactor (PWR) vendor SAMGs in use (i.e., Babcock and Wilcox, Combustion Engineering and Westinghouse) were each upgraded to include those Nuclear Regulatory Commission (NRC) Fukushima lessons learned that could be included without unnecessary delay. Phase Ⅱ integrates the three .individual SAMGs into one PWR SAMG and includes Fukushima lessons learned not included in Phase Ⅰ. Phase Ⅰ provided information to address a truncated set of lessons learned from the Fukushima severe accident. This included use of unpurified water sources, spent fuel pool severe accident mitigation actions and guidance for ventilating hydrogen from buildings adjacent to the Containment Building. Phase Ⅱ, when completed will include additional Fukushima severe accident lessons learned associated with shutdown modes, multi-unit events, command and control structure and interfaces with other emergency response organization activities. It will also include improvements to overcome known problematic areas, e.g., provide clear guidance that operators can follow without hesitation when the Technical Support Center is not active and eliminate procrastination by Technical Support Center (or Emergency Response Center) personnel in prescribing severe accident mitigating actions. The purpose of this paper is to describe the Phase I SAMG upgrade and present the structure, scope and capability of the Phase Ⅱ PWR SAMG.
机译:压水反应堆用户组(PWROG)正在升级原有的通用严重事故管理指南(SAMGs)。这种升级包括Ⅰ期,2013年1月完成,和Ⅱ期,在12月完成2013年Ⅰ期,在使用中的三个原始的压水反应堆(PWR)供应商SAMGs(即巴威,燃烧工程和西屋)分别升级为包括美国核管理委员会(NRC)福岛的教训可以被纳入无不必要的延误。 Ⅱ期集成了三个。个别SAMGs成一个PWR SAMG,包括福岛教训不包括在Ⅰ期。 Ⅰ期提供的信息来解决截断集合的福岛严重事故的经验教训。这包括使用的未净化水源,乏燃料池严重事故缓解行动和指导,从毗邻安全壳厂房建筑通风氢。 Ⅱ期,当完成将包括学会了关断模式,多单元的活动,指挥和控制结构和接口与其他应急响应组织活动相关的附加福岛严重事故的教训。它还将包括改进克服已知的有问题的区域,例如,提供明确的指导,运营商可以按照毫不犹豫地当技术支持中心不主动和消除技术支持中心(或应急处理中心)工作人员拖延在规定的严重事故缓解动作。本文的目的是描述一期SAMG升级和现在的Ⅱ期PWR SAMG的结构,范围和能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号