首页> 外文会议>Conference on nuclear training and education >New Nuclear Plant Training Challenges
【24h】

New Nuclear Plant Training Challenges

机译:新的核电站培训挑战

获取原文

摘要

The road from an Engineering, Procurement and Construction (EPC) Contract to a Construction and Operating License (COL) to the Commercial Operations Date (COD) for new nuclear plants is bumpy and circuitous. It is even more challenging for first-of-a-class plants. Training must commence in the same time frame as construction, followed closely by other operational readiness activities that are essential for line ownership of training programs.
机译:从工程,采购和建造(EPC)合同到建造和运营许可证(COL)到新核电厂的商业运营日期(COD)的道路坎bump曲折。对于一流的工厂而言,这甚至更具挑战性。培训必须在施工的同一时间范围内开始,紧随其后的是对培训计划的整体拥有至关重要的其他运营准备活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号