Schedule risk analysis in construction project using RFMEA and Bayesian networks: The Cali-Colombia case study

机译:使用RFMEA和贝叶斯网络进行建筑项目进度风险分析:加利福尼亚哥伦比亚案例研究

获取原文

摘要

The projects in the construction sector are developed in complex and dynamic circumstances due to uncertainties and risks. The schedule risk is the probability that the project exceeds the initial programming, for which several methodologies are proposed; on the other hand very few of them have been used in countries where the economies are in development. This paper presents a case study of the construction industry in the city of Cali-Colombia, integrating the RMFEA prioritization method and the Bayesian Networks model for the schedule risk analysis in construction projects. It will be possible to identify the main own risks in this type of projects and the impact that they have in the probability of finishing the project on time.
机译:由于不确定性和风险,建筑行业中的项目是在复杂而动态的环境中开发的。进度风险是项目超出初始计划的概率,为此提出了几种方法论;另一方面,在经济正在发展的国家中很少使用它们。本文以哥伦比亚卡利市的建筑业为例,结合RMFEA优先排序方法和贝叶斯网络模型对建筑项目的进度风险进行分析。可以确定此类项目中的主要风险及其对按时完成项目的可能性的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号