The O'Hare Modernization Program (OMP) is one of the largest construction projects in the country at one of the world's busiest airports, and is managed by the Chicago Department of Aviation (CDA). The OMP is transforming O'Hare International Airport from a system of intersecting runways into a modern parallel runway configuration.The UPRR freight mainline between Proviso and Wisconsin runs along the southwest side of O'Hare. Eight miles of this route was relocated 50 years ago to allow for the initial construction of O'Hare. History repeats itself as the current OMP plan requires the relocation of 2.5 miles of the same rail line. In 2007, the UPRR was relocated to an interim alignment that allowed the airport expansion to continue construction while properties needed for expansion were being acquired. The final rail realignment was completed in Spring 2012. Five miles of double track mainline was laid, including two new railroad over highway bridges; two new railroad over rail bridges; one shoo-fly bridge; and numerous retaining walls. This paper addresses the challenges of designing and constructing the railroad relocation amongst a wide range of overlapping airport and local construction projects. The presentation will also discuss the solutions, coordination and cooperation necessary to complete this mega-project from the different representatives' perspectives. AREMA members, many of whom will be flying into and out of O'Hare for the conference, will benefit from learning about the unique aspects of designing a railroad relocation project near one of the world's largest airports.
机译:O'Hare现代化计划(OMP)是全球最繁忙的机场最大的建筑项目之一,由芝加哥航空公司(CDA)管理。 OMP将O'Hare International Airport从交叉跑道的系统转变为现代平行的跑道配置。附带州和威斯康星州之间的UPRR货运主线沿着奥哈拉的西南部奔跑。这条路线八英里左右搬迁50年前,以允许o'hare的初步建设。历史重复本身,因为当前的OMP计划要求重定位2.5英里的相同铁路线。 2007年,UPRR被重新安置到临时对齐,使机场扩张继续施工,而膨胀所需的性质是在获得的。最终的轨道重新调整在2012年春季完成。铺设五英里的双轨主线,包括两辆新的铁路桥梁;两个新的铁路桥梁;一个舒瓦飞桥;和许多挡土墙。本文涉及设计和构建各种重叠机场和当地建筑项目中的铁路重新定位的挑战。展示还将讨论从不同代表的角度完成这一超级项目所需的解决方案,协调和合作。 Arema成员,其中许多人将进出O'hare o'hare o'hare,将受益于学习在世界上最大的机场之一靠近设计铁路搬迁项目的独特方面。

著录项

  • 来源
    《AREMA annual conference》|2012年|1475-1491|共17页
  • 会议地点
  • 作者

    Martin Ross;

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

  • 入库时间 2022-08-26 14:27:10

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号