首页> 外文会议>AIAA SPACE conference exposition >Resource Management and Contingencies in Aerospace Concurrent Engineering
【24h】

Resource Management and Contingencies in Aerospace Concurrent Engineering

机译:航空航天并行工程中的资源管理和突发事件

获取原文

摘要

A significant concern in designing complex systems implementing new technologies is that while knowledge about the system is acquired incrementally, substantial financial commitments, even make-or-break decisions, must be made upfront, essentially in the unknown. One practice that helps in dealing with this dichotomy is the smart embedding of contingencies and margins in the design to serve as buffers against surprises. This issue presents itself in full force in the aerospace industry, where unprecedented systems are formulated and committed to as a matter of routine. As more and more aerospace mission concepts are generated by concurrent design laboratories, it is imperative that such laboratories apply well thought-out contingency and margin structures to their designs. The first part of this publication provides an overview of resource management techniques and standards used in the aerospace industry. That is followed by a thought provoking treatise on margin policies. The expose presents the actual flight telemetry data recorded by the thermal discipline during several recent NASA Goddard Space Flight Center missions. The margins actually achieved in flight are compared against pre-flight predictions, and the appropriateness and the ramifications of having designed with rigid margins to bounding stacked worst case conditions are assessed. The second half of the paper examines the particular issues associated with the application of contingencies and margins in the concurrent engineering environment. In closure, a discipline-by-discipline disclosure of the contingency and margin policies in use at the Integrated Design Center at NASA's Goddard Space Flight Center is made.
机译:在设计新技术的复杂系统中,在设计新技术的重要令人担忧的是,虽然有关系统的知识是逐步获得的,但必须在未知的内部进行大量的财务承诺,即使是制作或破坏决策。一个有助于处理这种二分法的做法是设计中的突发性和边缘的智能嵌入,以作为惊喜的缓冲区。这个问题在航空航天行业的全部武力中呈现出来,在那里制定前所未有的系统并致力于作为常规的问题。随着越来越多的航空航天使命概念是由并发设计实验室产生的,因此,这种实验室必须将思考过分的应急和边缘结构应用于其设计。本出版物的第一部分概述了航空航天业中使用的资源管理技术和标准。随后是在保证金政策上挑衅论文的思想。曝光介绍了最近NASA戈达德太空飞行中心任务中的热学科记录的实际飞行遥测数据。在飞行中实际实现的利润率与飞行前预测进行比较,并且评估了用刚性边缘设计的适当性和改造,以堆积堆叠最坏情况条件。本文的下半场审查了与在并发工程环境中应用突发事件和利润率相关的特定问题。在闭幕状态下,美国国家航空航天局的戈达德航天飞行中心综合设计中心使用的应急和保证金政策的纪律披露。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号