首页> 外文会议>International conference on chemical engineering, metallurgical engineering and metallic materials >Removal Phosphorous from High Phosphorous Converter Steel Making Slag by Hydrometallurgical Process
【24h】

Removal Phosphorous from High Phosphorous Converter Steel Making Slag by Hydrometallurgical Process

机译:通过高磷转换器钢制造液渣的去除磷酸矿化方法

获取原文

摘要

Removing phosphorus from high phosphorus converter steel slag by hydrometallurgical method was studied in this paper.The influence of different dephosphorizting agents on the effect of phosphorus slag was investigated,and high efficient dephosphorizating agent was found.The effects of reaction time,liquid to solid ratio,stirring speed,reaction temperature and dephosphorizing agent concentration on the impact of dephosphorization were studied.The results showed that on the conditions of the reaction time 40 min,slag particle size <0.147 mm,liquid to solid ratio of 4∶1,stirring speed 400 rpm,the reaction temperature 25 °C,and dephosphorizing agent concentration 5 mol/L,the optimum dephosphorization results were achieved.The dephosphorization ratio can reach 70%,and the phosphorus content in steel slag decreased from 1.03% to 0.46%,the total iron content increase from 30.676% to above 44%.
机译:本文研究了通过氢化冶金方法从高磷转换器钢渣中除去磷。研究了不同脱磷试剂对磷渣效应的影响,并发现了高效的脱磷剂。反应时间,液体与实心比的影响研究了搅拌速度,反应温度和脱磷剂浓度对脱磷的影响。结果表明,在反应时间40分钟的条件下,炉渣粒径<0.147mm,液体为4:1,搅拌速度400rpm,反应温度25℃和脱磷剂浓度5mol / l,实现了最佳的脱磷结果。脱磷率可达到70%,钢渣中的磷含量从1.03%降至0.46%,总铁含量从30.676%增加到高于44%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号