The success or failure of a horizontal directional drilling HDD operation is usually determined priorto one stick of drill stem entering the ground. If the soil conditions at the designed entry point are problematic thesuccess of the entire project could be at stake if proper precautions are not implemented. The use of a HDD assistcasing (a.k.a. Conductor Barrel) has taken problematic soil conditions and made them drillable.Boston’s Logan Airport required additional electric capacity as part of their 2010/2011 terminal upgrade. SoutheastDirectional Drilling, Casa Grande, Arizona was hired on by NSATR, Massachusetts-based, investor-owned electricand gas utility, to do the HDD crossing beneath the Chelsea River. The project involved installing three conduitbundles across the Chelsea River. Each bundle consisted of seven 8-inch diameter HDPE conduits. The threeparallel river crossings were spaced 20 feet apart with lengths of 1,600 feet each.Southeast Directional Drilling (SEDD) was given a 3-month schedule to complete their portion of the project. Itwas determined that contaminated soil conditions were present along the bore path. SEDD decided to install a 48-inch diameter steel conductor barrel at each proposed HDD entry point to help isolate the contaminated soils. Thesteel casings were driven a length of 120 feet at the entry angle to the bore using a 24-inch diameter pneumatichammer. The 24-inch pneumatic hammer can generate impact forces in excess of 4 million pounds. The HDDportion of the project was completed within the 3-month schedule.Difficult and challenging HDD projects, in diverse and challenging soils and locations are becoming more and moreprevalent throughout North America. The pneumatic pipe ramming hammers are proving their value on thesechallenging projects be it with HDD assist, HDD extraction or conductor barrel installations.
机译:水平定向钻探HDD操作的成败通常是事先确定的 一根钻杆插入地面。如果设计入口处的土壤条件有问题,则 如果不采取适当的预防措施,整个项目的成功可能会受到威胁。使用硬盘辅助 套管(又称导体桶)遇到了问题土壤,并使其可钻。 波士顿的洛根机场(Logan Airport)在其2010/2011年航站楼升级过程中需要增加电力容量。东南 亚利桑那州卡萨格兰德定向钻井被总部位于马萨诸塞州NSATR的投资者所有的电力公司聘用 和天然气公司,在切尔西河下面进行HDD穿越。该项目涉及安装三个导管 捆切尔西河。每个束由七个直径为8英寸的HDPE导管组成。他们三个 平行的河道相距20英尺,每个长度为1,600英尺。 东南定向钻井(SEDD)获得了为期3个月的进度表,以完成他们的部分项目。它 确定在钻孔路径上存在受污染的土壤条件。 SEDD决定安装48- 每个提议的硬盘驱动器入口点的直径为1英寸的钢制导体筒,以帮助隔离受污染的土壤。这 使用直径为24英寸的气动装置将钢制套管以120英尺的长度驱动到孔的入口角处 锤子。 24英寸的气动锤可以产生超过400万磅的冲击力。硬盘 项目的一部分已在3个月的时间表内完成。 在各种挑战性土壤和地点中困难而富挑战性的HDD项目正变得越来越多 遍及整个北美。气动管道夯锤在这些方面证明了自己的价值 带有HDD辅助,HDD抽取或导体桶安装的具有挑战性的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号