Franklin Falls – The Toughest Trenchless Crossing in New Hampshire

机译:富兰克林瀑布–新罕布什尔州最艰难的无沟渠穿越

获取原文

摘要

As part of construction of a new water treatment plant, the City of Franklin, New Hampshire,recently completed installation of two 12-in. HDPE pipelines below the Pemigewasset River. The crossing locationis situated to the southeast of the Franklin Falls Dam, which is operated by U.S. Army Corps of Engineers. At thislocation, the river includes two separate channels, each about 300 to 500 feet wide, separated by an approximately560-ft wide wooded peninsula. To minimize disturbance to the river, the crossings were completed using horizontaldirectional drilling (HDD) and four (4) separate drill paths; two per river channel.Initial land-based test borings, and geophysical survey suggested the bore paths would encounter granular alluvialand fluvial deposits. However, an unfortunate surprise was in store: an historic armoring was present below theriver bottom along two of the bore paths. This armoring consisted of 10 to 20-ft diameter stone blocks, carefullyplaced to form a channel raceway/spillway during initial dam construction (circa 1920). Ultimately, this armoringwould create havoc for an HDD contractor expecting a soil-based alignment, on a schedule driven project. Thispaper details the design and planning elements of the project, and the construction phase modifications that wererequired to complete the installation below this immovable obstruction.
机译:作为新水处理厂建设的一部分,新罕布什尔州富兰克林市 最近完成了两个12英寸的安装。在Pemigewasset河下方的HDPE管道。穿越位置 位于美国陆军工程兵团运营的富兰克林瀑布大坝的东南方。在这 河流的位置包括两条独立的河道,每条河道宽约300到500英尺,由大约 560英尺宽的树木繁茂的半岛。为了最大程度地减少对河流的干扰,使用水平 定向钻探(HDD)和四(4)个单独的钻探路径;每个河道两个。 最初的陆基测试钻孔和地球物理调查表明,钻孔路径会遇到粒状冲积层 和河流沉积物。然而,不幸的是,商店里有个惊喜:历史悠久的装甲出现在战车下方。 沿两条钻孔路径的河底。这种装甲由直径为10到20英尺的石块组成, 在最初的大坝建设期间(大约1920年)放置以形成河道跑道/溢洪道。最终,这种装甲 在按时间表进行的项目中,HDD承包商会期望基于土壤的对齐方式而造成严重破坏。这 论文详细介绍了该项目的设计和规划元素,以及对施工阶段的修改。 需要在此不可移动的障碍物下方完成安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号