Solution of earth retaining structure using Cutter Soil Mixing technology: 'Parking Saint Nicolas' Project at Cannes, France

机译:地球保留结构用刀具土混合技术解决方案:法国戛纳“停车圣尼索拉”项目

获取原文

摘要

This paper presents the most relevant design and execution aspects of a peripheral retaining structure for the construction of "Parking Saint Nicolas ", an underground parking lot located at Cannes, France. The retaining wall to the construction of the four underground floors was executed through soil-cement panels by the application of deep soil mixing technology, particularly the Cutter Soil Mixing (CSM) technology, reinforced with vertical steel piles. Taking in account the constrains related to the urban surrounding, including the proximity of buildings and streets, were implemented two levels of reinforced concrete slab bands at the levels of floors "0" and "-2", creating a rigid support system of the four elevations. The slab bands were incorporated on the final structure of the building and with this solution was dispensed the execution of ground-anchors with big lengths that would lead to the occupation of the neighbour underground. This solution brought some economic benefits, especially due to the incorporation of elements used in the final structure at the preliminary stage of the work. The main objectives of the retaining wall solution were allow the vertical excavation assuring simultaneously the stability of nearby structures and infrastructures, and also reduce the inflow of water into the interior of the excavation during the construction phase. The main results of modelling, instrumentation, monitoring and quality control of the work are also presented.
机译:本文提出了一种外围护结构的最相关的设计和执行方面的“停车圣尼古拉斯”,地下停车场位于法国戛纳的建设。的挡墙四个地下两层的建筑由深层土壤混合技术,特别是切割土拌和(CSM)技术,具有垂直钢桩钢筋的应用程序通过水泥土板执行。根据经营相关的城市的约束周边,包括建筑物和街道附近,在地板的“0”和“-2”的水平,实现钢筋混凝土板带的两个层次,创建四个的刚性支撑系统升高。板坯带被纳入建筑物的最终结构,并用此溶液分地面锚的大长度,这将导致邻居地下占领执行。该解决方案带来了一定的经济效益,特别是由于在工作的初步阶段,在最终结构中使用的元素的结合。挡土墙溶液的主要目的是允许纵向挖掘同时确保附近结构和基础设施的稳定性,并且也减少水的流入挖掘的内部在施工阶段。建模,仪器仪表,监控和工作质量控制的主要结果也。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号