Solution of earth retaining structure using Cutter Soil Mixing technology: 'Parking Saint Nicolas' Project at Cannes, France

机译:使用刀具土壤混合技术解决挡土结构的解决方案:法国戛纳的“ Parking Saint Nicolas”项目

获取原文

摘要

This paper presents the most relevant design and execution aspects of a peripheral retaining structure for the construction of "Parking Saint Nicolas ", an underground parking lot located at Cannes, France. The retaining wall to the construction of the four underground floors was executed through soil-cement panels by the application of deep soil mixing technology, particularly the Cutter Soil Mixing (CSM) technology, reinforced with vertical steel piles. Taking in account the constrains related to the urban surrounding, including the proximity of buildings and streets, were implemented two levels of reinforced concrete slab bands at the levels of floors "0" and "-2", creating a rigid support system of the four elevations. The slab bands were incorporated on the final structure of the building and with this solution was dispensed the execution of ground-anchors with big lengths that would lead to the occupation of the neighbour underground. This solution brought some economic benefits, especially due to the incorporation of elements used in the final structure at the preliminary stage of the work. The main objectives of the retaining wall solution were allow the vertical excavation assuring simultaneously the stability of nearby structures and infrastructures, and also reduce the inflow of water into the interior of the excavation during the construction phase. The main results of modelling, instrumentation, monitoring and quality control of the work are also presented.
机译:本文介绍了用于“ Parking Saint Nicolas”(位于法国戛纳的地下停车场)施工的外围固定结构的最相关设计和执行方面。四层地下建筑的挡土墙是通过使用深层水泥搅拌技术,特别是采用垂直钢桩加固的Cutter泥土搅拌(CSM)技术,通过土壤-水泥面板完成的。考虑到与城市周围环境有关的限制,包括建筑物和街道的接近性,在“ 0”和“ -2”层分别实施了两层钢筋混凝土板带,从而形成了四层的刚性支撑系统。高程。平板带被并入建筑物的最终结构中,并且采用这种解决方案免除了大长度地锚的执行,这会导致邻居在地下的占领。这种解决方案带来了一些经济利益,特别是由于在工作的初期阶段将最终结构中使用的元素合并在一起。挡土墙解决方案的主要目的是允许垂直挖掘同时确保附近结构和基础设施的稳定性,并在施工阶段减少水流入挖掘内部的可能性。还介绍了工作建模,仪表,监控和质量控制的主要结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号