THE NEW LAKE TOWNSEND DAM - DESIGN CONSTRAINTS AND CONSTRUCTION CHALLENGES

机译:新的湖镇大坝-设计约束和施工挑战

获取原文

摘要

Challenges on the Lake Townsend Dam Replacement Project were primarily related to the need to maintain a fully operational reservoir during construction while constructing a new dam immediately downstream, passing up to 10,000 cfs of flood flows through the dam site throughout construction, dewatering and ensuring stability of the excavation, and identification of suitable backfill for the labyrinth spillway. The use of cement-modified soil as foundation backfill resolved issues with borrow materials being too wet to compact effectively. The use of CMS had a number of benefits, including reducing schedule and construction risks by becoming more independent of the weather. Ancillary benefits included providing an excellent, weather resistant foundation surface from which to work, and the ability to carve vertical walls for concrete forming that required no shoring. Figure 21 shows the completed new dam following impoundment and demolition of the old spillway section.
机译:汤森湖大坝置换项目面临的挑战主要与在施工期间保持水库正常运转,同时在下游直接建造新大坝的需求有关,整个施工过程中高达10,000 cfs的洪水流量通过大坝现场,脱水并确保了水库的稳定性。迷路溢洪道的开挖和合适的回填的确定。使用水泥改性的土壤作为基础回填解决了借入材料太湿而无法有效压实的问题。 CMS的使用具有许多好处,包括通过变得更加不受天气影响而减少进度和施工风险。附带的好处包括提供出色的,耐候性的基础表面,可从中进行工作,以及能够在不需要支撑的情况下雕刻垂直墙以进行混凝土成型。图21显示了旧溢洪道段的蓄水和拆除后已完成的新大坝。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号