首页> 美国政府科技报告 >Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 1. Narrative, sections 1 thru 9
【24h】

Clarence Cannon Dam and Mark Twain Lake Foundation and Embankment Completion Report. Part 2. Main Dam, Phase II Construction and Related Contracts. Volume 1. Narrative, sections 1 thru 9

机译:Clarence Cannon Dam和mark Twain Lake Foundation和Embankment Completion Report。第2部分。主坝,第二阶段施工及相关合同。第1卷。叙述,第1至9节

获取原文

摘要

Contents: Introduction; Foundation Investigations; Geology; Unwatering; Foundation Excavation; Foundation Treatment; Rock Bolts and Stilling Basin Anchors; Post Tensioning; Structural Concrete.