首页> 外文期刊>Water and Energy International >BUILDING TEHRI MEGA DAM IN HIMALAYAS CHALLENGES IN DESIGN AND CONSTRUCTION
【24h】

BUILDING TEHRI MEGA DAM IN HIMALAYAS CHALLENGES IN DESIGN AND CONSTRUCTION

机译:在喜马拉雅州兴建TEHRI MEGA DAM在设计和建造方面面临的挑战

获取原文
获取原文并翻译 | 示例
           

摘要

Successful completion of India's highest dam across Bhagirathi (Ganga)-the third highest Embankment dam in the world, is a landmark development in the annals of high dam building in India. Located in highly complex geo-tectonic environs of Himalayas-aregion prone to high seismic activity, its safe design and construction, posed immense technical challenges. The paper describes in a nutshell, how these challenges have been adequately met by THDC, which the author believes, was possible, with human efforts being blessed by the mother river.
机译:印度第三大堤坝Bhagirathi(Ganga)的最高水坝的成功建成,是印度高水坝建筑史上的一个里程碑式发展。喜玛拉雅山脉地处高度复杂的地质构造环境中,容易发生强烈的地震活动,其安全的设计和施工带来了巨大的技术挑战。本文简述了THDC如何充分应对这些挑战,作者相信,在母亲河的祝福下,人类的努力是有可能的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号