首页> 外文会议>Collection Systems Conference >City of Baltimore Design Management for CD Wet Weather Program – Need for Standardization
【24h】

City of Baltimore Design Management for CD Wet Weather Program – Need for Standardization

机译:CD潮湿天气计划的巴尔的摩市设计管理 - 需要标准化

获取原文
获取外文期刊封面目录资料

摘要

The City of Baltimore (the City) is under a Consent Decree (CD) to improve its wastewater collection system by the year 2016. Section Ⅵ, Paragraph 9 of this Consent Decree requires the City to evaluate its sanitary sewer collection system, prepare sewershed study plans, and implement these plans to rehabilitate its sewer collection system. A key component of these plans is the rehabilitation of sanitary sewers utilizing trenchless technologies. The City is currently in the design phase of the Consent Decree which includes upgrade/new pipe, cleaning and CIPP lining, point repairs, pipe replacement, manhole rehabilitation, etc. Throughout the City. In order to successfully manage these projects and address variations in trenchless technology design, the MWH-LBWS Joint Venture Consent Decree Program Management Team (PMT) working with the Utility Engineering Section (UES) developed a systematic approach to standardize design and construction processes. This standardization is expected to provide lower-cost bids when most of the projects are advertised in 2012 and 2013.
机译:巴尔的摩市(该城市)在同意法令(CD)下,将其在2016年度改进其废水收集系统。第四节,本同意书第9段要求城市评估其卫生下水道收集系统,准备下水道研究计划,并实施这些计划来恢复其下水道收集系统。这些计划的一个关键组成部分是利用恒星技术的卫生下水道的康复。该市目前处于同意法令的设计阶段,包括升级/新型管道,清洁和CIPP衬里,点维修,管道替代,人孔康复等。为了成功地管理这些项目和地址变化,即MWH-LBWS合资企业同意法令管理团队(PMT)与实用工程部分(UE)一起使用,制定了一种系统化设计和施工过程的系统方法。当大多数项目在2012年和2013年宣告时,预计该标准化将提供低成本的出价。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号