首页> 外文会议>PVP2011;ASME Pressure Vessels and Piping conference >PROGRESS TOWARDS THE REVISION OF BS 7910
【24h】

PROGRESS TOWARDS THE REVISION OF BS 7910

机译:BS 7910修订版的进展

获取原文

摘要

BS 7910, the UK procedure for the assessment of flaws in metallic structures, is being revised with a view to publication in 2012. Like the existing procedure, the new procedure will address all major failure/damage mechanisms, namely fracture, fatigue, creep and corrosion, and is intended to be used across a range of industry sectors and component types. There are several major proposed changes, which draw mainly on the existing BS 7910 procedures, the UK nuclear industry's R6 document and the European FITNET procedure. The most far-reaching changes are in Section 7 (fracture) and related annexes. Here, the modifications include: 1. a re-structuring of the fracture assessment procedures from their present form (Levels 1-3) to a new hierarchy based on Options 1-3, which are more compatible with the current R6 and FITNET approaches. 2. revised treatment of flaw interaction. 3. a new annex (Annex N) permitting analysis under conditions of reduced crack tip constraint. 4. a new annex (I) addressing analysis of weld strength mismatch. 5. a revised residual stress compendium (Annex Q). As part of the revision, all annexes will be reviewed and edited where necessary, and a new annex on non-destructive examination (NDE) will be included for the first time. In view of the fact that many of the major changes concern the fracture assessment clauses, this paper presents a case study based on the analysis of a fully-circumferential flaw in a pipeline girth weld. The basic assessment Options (1 and 2) given in the new procedure are used to analyse the flaw, and three more advanced techniques (constraint-based assessment, assessment using an idealised residual stress distribution and analysis based on weld strength mismatch) are also applied.
机译:BS 7910是英国用于评估金属结构缺陷的程序,现正在修订中,以期于2012年发布。与现有程序一样,新程序将解决所有主要的失效/损坏机制,即断裂,疲劳,蠕变和腐蚀,旨在用于各种行业和组件类型。提出了几项主要的建议更改,这些更改主要借鉴了现有的BS 7910程序,英国核工业的R6文件和欧洲FITNET程序。影响最深远的变化是在第7节(断裂)和相关附件中。在此,修改包括:1.将骨折评估程序从其当前形式(1-3级)重组为基于选项1-3的新层次结构,这与当前的R6和FITNET方法更加兼容。 2.修改缺陷相互作用的处理方法。 3.一个新的附件(附件N)允许在降低的裂纹尖端约束条件下进行分析。 4.一个新的附件(一),关于焊接强度不匹配的分析。 5.修订后的残余应力纲要(附录Q)。作为修订的一部分,所有附件将在必要时进行审核和编辑,并且将首次包括新的无损检测附件。鉴于许多重大变化涉及断裂评估条款,本文基于对管道环缝焊缝全周缺陷的分析,提出了一个案例研究。新程序中给出的基本评估选项(1和2)用于分析缺陷,并且还应用了三种更先进的技术(基于约束的评估,使用理想残余应力分布的评估以及基于焊接强度不匹配的分析)。 。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号