PLANNING, DESIGN AND CONSTRUCTION OF THE HALIFAX SHIPYARD MODERNIZATION PROGRAM

机译:哈利法克斯造船厂现代化计划的规划,设计和建设

获取原文

摘要

Irving Shipbuilding Inc. (the owner) has embarked on a two year modernization program for the Halifax Shipyard to prepare the company's facilities to build Canada's future combatant ships. The centrepiece of the facility will be an enclosed and fully integrated fabrication and assembly building, volume in excess of 850,000 m~3, where vessels will be almost fully assembled in longitudinal sections weighing up to 3,000 metric tonnes (MT). A fabric door at the end of the assembly line provides a clear opening 54m wide by 33m high. The building structural steel frame supports over a dozen major overhead and semi gantry cranes, capacities up to 200 MT, hook height 37m. from the floor and spans approaching 55m. As many as three levels of cranes overlap. To provide the necessary crane rail alignment, strict construction tolerances are required. Foundation conditions are challenging due to the presence of debris and soft materials. Floor slabs as much as 1.2m thick are sensitive to settlement. The owner places high importance on visual impact, exterior and also interior. The owner required Building Information Modeling technology (BIM) as part of the engineering of the facility. Construction is phased to minimize disruption to a functioning shipyard where space is at a premium. The paper focuses on details of engineering and construction of interest to the practicing structural engineer, fabricator and those engaged in modeling of such structures.
机译:Irving Shipbuilding Inc.(业主)已开始为哈利法克斯造船厂进行两年的现代化计划,为公司建造加拿大未来的战斗船的设施。该设施的核心将是一个封闭和完全综合的制造和装配建筑,超过850,000 m〜3的体积,其中血管将在称重高达3,000公吨(MT)的纵向部分中。装配线末端的织物门提供54m宽的透明开口33米高。建筑结构钢架支撑着十几个主要的开销和半龙门起重机,容量高达200吨,钩子高37m。从地板和跨度接近55米。多达三个级别的起重机重叠。为了提供必要的起重机轨道对齐,需要严格的施工公差。由于存在碎屑和软材料,基础条件是挑战性的。地板平板多达1.2米的厚度对沉降敏感。所有者对视觉冲击,外部和室内装饰的高度重视。业主要求建立信息建模技术(BIM)作为设施工程的一部分。施工分阶段以尽量减少对运作造船厂的破坏,空间处于溢价。本文重点介绍了练习结构工程师,制造商和从事这种结构建模的工程和兴趣建设的细节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号