Comparison of the Construction Planning and Manpower Schedules for Building the PD214 General Mobilization Ship in a U.S. Shipyard and in a Japanese Shipyard

机译:在美国造船厂和日本造船厂建造pD214总动员船的施工规划和人工进度比较

获取原文

摘要

The study compares the construction planning and manpower schedules for production of five PD214 general mobilization ships at Avondale Shipyards, New Orleans, and at Kawasaki Shipyards, Kobe, Japan. As background for the comparison an examination was also made of the facilities and equipment in place at each yard. Overall, KHI's delivery period for the first ship was 60 weeks after contract signing; Avondale's construction schedule for the first ship is 140 weeks after contract. The manloading for building the five ships is consistently greater in every phase of costruction at Avondale than at Kobe. The overall difference is about 2.32 times (1374 thousand manhours at Avondale versus 594 thousand manhours at KHI-Kobe). Both yards exhibited experience curve benefits, with Avondale's improvement being greater.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号