首页> 外文会议>Annual conference of the Canadian Society for Civil Engineering >INTEGRATING BRIDGE INFORMATION MODELING (BrIM) WITH COST ESTIMATION AT THE CONCEPTUAL DESIGN PHASE OF BRIDGES
【24h】

INTEGRATING BRIDGE INFORMATION MODELING (BrIM) WITH COST ESTIMATION AT THE CONCEPTUAL DESIGN PHASE OF BRIDGES

机译:集成桥信息建模(Brim)在桥梁概念设计阶段的成本估算

获取原文

摘要

Integration of bridge information modeling (BrIM) with bridge management systems and computer-aided engineering design solutions had inspired many researchers over the past few years. Several successful integrations of BrIM with these solutions had significantly leveraged downstream processes of bridge projects. Over the years, one of the major obstacles encountered by BrIM integration experts was the functional interoperability with other solutions. In this study, research objectives are intended to demonstrate the viability of integrating BrIM with cost estimation while resolving BrIM integration with computer-aided structural analysis solutions interoperability issues. In this paper, an integrated prototype that fosters operational efficiency and cost savings for multiple types of bridges is presented. The proposed research methodology includes a preliminary estimation system comprising cost optimization modules which is developed in a .NET framework. The developed prototype will be capable of receiving and automatically incorporating 3D real-time information reflecting site alterations and corresponding effects on project overall cost. A case project was defined to validate the model and illustrate its corresponding numerical capabilities. Results presented in this study will enhance estimation techniques for bridge contractors and stakeholders by the inclusion of all direct and indirect costs associated with the different phases of a bridge project ranging from design conceptual phases to substructure, including heavy earthmoving operations, and superstructure. The prototype model is anticipated to be of major significance to contractors and considered a "brand-new" contribution to BrIM integrated technologies with cost management approaches.
机译:桥梁信息建模(Brim)与桥梁管理系统和计算机辅助工程设计解决方案集成在过去几年中启发了许多研究人员。利用这些解决方案的几个成功的边缘集成了桥梁项目的下游过程。多年来,边缘融合专家遇到的主要障碍之一是与其他解决方案的功能性互操作性。在本研究中,研究目标旨在展示整合Brim与成本估计的可行性,同时解决与计算机辅助结构分析解决方案互操作性问题的边缘集成。本文提出了一种综合原型,介绍了为多种类型的桥梁提供运营效率和成本节约的综合原型。所提出的研究方法包括初步估计系统,包括在.NET框架中开发的成本优化模块。开发的原型将能够接收和自动地结合反映现场更改和对项目总体成本的相应影响的3D实时信息。定义案例项目以验证模型并说明其相应的数值功能。本研究中提出的结果将通过包含与桥梁项目的不同阶段相关的直接和间接成本来增强桥梁承包商和利益攸关方的估算技术,包括从设计概念阶段到子结构,包括重型地球移动操作和超级结构。预计原型模型将对承包商具有重要意义,并考虑了与成本管理方法的边缘综合技术的“全新”贡献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号