【24h】

Flow analysis and dynamic slope stability in a copper ore heap leach

机译:铜矿堆浸过程中的流动分析和动态边坡稳定性

获取原文

摘要

This paper presents a numerical analysis for the unsaturated flow throughout a copper ore heap leach as well as static and dynamic slope stability analyses since the structure is planned to be built in a highly seismic region in the South of Peru. The heap will be constructed with non-treated copper ore (run of mine) on an impermeable pad specially devised to avoid the possibility of ground contamination by the flow of the acid solution. The numerical results obtained in the stability analyses indicate that the heap leach presents satisfactory safety factors even when considering earthquakes of magnitude 7.5 with maximum acceleration of 0.30g. It has been also observed that the phreatic line formed by the lixiviation solution does not reach the layers devised to protect the drainage pipes of the lixiviation system.
机译:本文呈现了在整个铜矿堆浸出过程中的不饱和流量的数值分析,以及静态和动态边坡稳定性分析,因为计划建造在秘鲁南部的高度地震区域中。堆将在专门设计的不透水垫上构建有未处理的铜矿(矿井运行),以避免通过酸溶液的流动污染地污染的可能性。在稳定性分析中获得的数值结果表明,即使考虑大幅度7.5的地震,堆射线也呈现令人满意的安全因子,最大加速度为0.30g。已经观察到,由l引发溶液形成的潜水线不会到达设计以保护液化系统的排水管的层。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号