IS IT ROCK YET? FOUNDATION TREATMENT FOR THE ROCKY PEN RUN DAM

机译:现在还可以吗?落基笔润坝的基础处理

获取原文

摘要

The proposed Rocky Pen Run Reservoir is a 5.5 billion gallon pumped storage facility that will serve as a major water supply reservoir for the County of Stafford in Virginia. The project consists of a 135-foot high main dam and spillway, reservoir outlet works and pump station, saddle dike, river intake and pump station along the Rappahannock River, water treatment plant, and pipelines. The owner and operator of the facility is the Stafford County Department of Utilities. The project site is located in the Eastern Piedmont Physiographic Province, which is characterized by a complex system of metamorphic and igneous rocks that have been folded and faulted throughout geologic time that have been differentially weathered. These geologic processes have resulted in complex and highly variable foundation conditions that present technical challenges to the designer that correspondingly increase the risk of costly change orders, claims of differing site conditions, and delays during construction. The preliminary engineering and design for the project began in 2004 and over the last seven years has evolved as additional subsurface information has become available. Following the initial geotechnical investigations and alternatives analysis, a roller-compacted concrete (RCC) dam with an integrated gated spillway was selected. Because of the risks associated with the Piedmont geologic conditions, the dam construction was divided into several phased construction contracts in order to conduct the foundation preparation in advance of the dam construction. This approach was selected as a means of concentrating the risk associated with the uncertain and variable foundation conditions in one contract and to subsequently use the "as-built" results to tailor the final dam design to actual foundation conditions. During the initial foundation excavation contract difficulties were encountered due to a major shear zone and highly variable rock conditions that raised the question as to the suitability of the foundation for an RCC dam. Following a re-evaluation of foundation conditions, it was concluded that the foundation was adequate for an RCC. However, by this time economic conditions had changed and following a second alternatives analysis, it was decided to change the dam type to an earth dam. The design was modified for an earth dam and a new foundation treatment design was prepared which was tailored to the encountered rock conditions. The geologic mapping of the foundation exposed during the initial excavation contract was used extensively to design measures to treat the six documented shear zones. The second foundation contract consisted of relocating the diversion alignment, some additional excavation, treatment of the irregular foundation with rock trimming and backfill concrete, dental excavation and treatment of shear zones and other geologic discontinuities, with a two-row grout curtain supplemented by blanket and stitch grouting along shear zones. The paper describes the results of the multi-faceted geotechnical investigations and foundation characterization conducted for the project, the foundation treatment design, and how the design was adapted during construction to address the complex geologic conditions, as well as other issues.
机译:拟议中的洛基彭润水库是一座耗资55亿加仑的抽水蓄能设施,将成为弗吉尼亚州斯塔福德郡的主要供水水库。该项目包括一条135英尺高的大坝和溢洪道,水库出口工程和泵站,马鞍堤,拉帕汉诺克河沿岸的取水和泵站,水处理厂和管道。该设施的所有者和经营者是斯塔福德郡公用事业部。该项目地点位于东部皮埃蒙特自然地理省,其特征是复杂的变质和火成岩系统,这些系统在整个地质时间内都被折叠和断层,并经历了不同的风化作用。这些地质过程导致了复杂而变化多端的地基条件,给设计人员带来了技术挑战,从而相应地增加了变更单成本高昂,要求不同工地条件以及施工延误的风险。该项目的初步工程和设计始于2004年,在过去的七年中,随着可获得的更多地下信息而发展起来。在最初的岩土工程研究和替代分析之后,选择了带有一体式闸门溢洪道的碾压混凝土(RCC)大坝。由于与皮埃蒙特地质条件有关的风险,大坝建设被分为几个阶段的建设合同,以便在大坝建设之前进行基础准备。选择这种方法是将风险与不确定的可变基础条件相关的风险集中在一个合同中,然后使用“竣工”结果将最终大坝设计调整为实际基础条件的一种方法。在最初的基坑开挖合同中,由于主要的剪切带和高度变化的岩石条件而遇到了困难,这引发了关于RCC大坝的地基适用性的问题。在对基础条件进行重新评估之后,得出的结论是,基础足以满足RCC的要求。但是,到了此时,经济状况发生了变化,并且在进行了第二次替代分析之后,决定将大坝类型更改为土坝。修改了土坝的设计,并准备了新的地基处理设计,以适应遇到的岩石条件。初始开挖合同期间暴露的地基地质图被广泛用于设计措施,以处理记录在案的六个剪切带。第二个基础合同包括重新布置改道路线,进行一些额外的开挖,用岩石修整和回填混凝土处理不规则的地基,进行牙科开挖以及处理剪切带和其他地质不连续性,以及两排灌浆幕,并辅以橡皮布和沿剪切区缝制灌浆。本文描述了对该项目进行的多方面岩土工程调查和基础表征,基础处理设计的结果,以及在施工期间如何调整设计以解决复杂的地质条件以及其他问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号